Land levelling in architectural and construction administration practice
The article presents an anonymised case study concerning a notification of land levelling by relocating soil within the property and partially importing material. The first-instance authority objected, assuming that the absence of land levelling from Article 29 of the Polish Construction Law meant that a building permit was required. The appellate authority overturned that decision, holding that the applicability of Articles 29 and 30 depended on whether the planned activities constituted construction or construction works, including their relationship with a specific construction project and the possibility of creating an earth structure. The legal analysis is supplemented by an engineering perspective on fill soils and engineered embankments. The discussion also addresses the separate application of water and waste legislation and the limits of review by architectural and construction administration authorities.
Authors
- Paweł Rojczyk
Publication Details
- Journal
- MATERIAŁY BUDOWLANE
- Published
- 2026-11-24
- DOI
- https://doi.org/10.15199/33.2026.11.14
- Primary Topic
- Polish Law and Legal System
- Type
- article
- Field-Weighted Citation Impact
- 0.00