Degradation-Aware Sizing and Dispatch of Photovoltaic and LFP Battery Storage for a Lahore Hospital under Load-Shedding
Hospitals cannot defer electricity demand in the way other commercial buildings can: operating theatres, intensive care, cold-chain storage and life-safety systems must remain supplied through every grid outage. In Lahore, Pakistan, prolonged load-shedding makes that requirement a sizing and control problem rather than a simple backup-generator problem. This study sizes photovoltaic (PV) generation and lithium iron phosphate (LFP) battery storage for a hospital in Lahore under load-shedding, using an hourly simulation over 8,760 hours. Solar resource is taken from two independent sources — a Photovoltaic Geographical Information System (PVGIS) typical meteorological year (1,868 kWh/m²/year) and NASA POWER hourly data for the actual year 2025 (1,706 kWh/m²/year) — and demand is represented by a transparent, reproducible synthetic hospital load of 823.7 MWh/year (peak 191 kW), of which 525.1 MWh/year (63.7%) is critical load after a correction described in full. Sixteen PV–battery combinations (PV 100–300 kWp × LFP 100–400 kWh) are tested under three outage scenarios (4, 8 and 12 hours per day) and two dispatch rules, with PV degradation tested at the standard warranty rate of 0.5%/year and at a Punjab field rate of 1.63%/year. Bills are computed at the National Electric Power Regulatory Authority (NEPRA) flat commercial tariff of Rs 39.76/kWh with exports credited at the 2026 net-billing rate of Rs 8.13/kWh. Without PV or storage, 177.2 MWh/year of critical load is unserved in the base case of 8 outage hours per day. The central finding is that dispatch matters more than battery size. If the battery is charged only from PV surplus (Dispatch A), daytime hospital load absorbs almost all PV output, the battery is usually empty when an outage begins, and 69.5–121.4 MWh/year of critical load remains unserved even at the largest sizes tested. If the battery is charged from the grid in the three hours before each scheduled outage block so that it is full when the outage starts (Dispatch B), unserved critical load falls to zero in the base case from 100 kWp PV with 200 kWh storage upward. The central case adopted in this paper is 300 kWp PV with 200 kWh LFP under Dispatch B: in the base case it generates 437.5 MWh/year, imports 388.4 MWh/year, exports 26.7 MWh/year, leaves unserved critical load at 0.00 MWh/year and bills Rs 15.22 million/year — Rs 5.92 million below the Rs 21.15 million no-system baseline — at about 775 equivalent full cycles per year. The smaller alternative, 200 kWp PV with 200 kWh LFP under the same dispatch, is the smallest system at the 200 kWp scale that reaches zero unserved critical load (annual bill Rs 18.37 million, a saving of Rs 2.78 million). Resilience under Dispatch B is bought with higher grid imports and much heavier battery cycling (about 550–1,160 equivalent full cycles per year, compared with about 2–350 under Dispatch A), which shortens cycling life to roughly 3–9 years against a 3,000–5,000-cycle LFP rating and must be priced into any procurement decision. The central case does not extend to severe outages: under severe 12-hour outages, 300 kWp with 200 kWh under Dispatch B still leaves 21.3 MWh/year of critical load unserved, and near-zero severe cover requires 200 kWp with 300 kWh under Dispatch B, which leaves only 0.06 MWh/year unserved. PV degradation at the field rate reduces output by 15.1% by Year 10, but Dispatch B still holds unserved critical load at zero because grid charging compensates; the degradation cost appears in the bill instead. Because self-consumption is 94–100% at the sizes tested, the low net-billing export price has little effect on these results. No payback period is claimed, because capital costs were not priced from quotations. The single most valuable next step is to replace the synthetic load with the hospital's measured SCADA log or twelve months of electricity bills and to re-run the identical model.
Authors
- Syed Muhammad Hussain Haider
Institutions
- Renewable Energy Systems (United States) (US)
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2026-11-24
- DOI
- https://doi.org/10.5281/zenodo.24501259
- Primary Topic
- Power Systems and Renewable Energy
- Type
- preprint