Comparative Analysis between Conventional Concrete and UHPC with GGBFS in PCI Girder Bridge Construction

Precast Concrete I-Girder (PCI girder) bridges are typically utilized for short to medium spans due to their ease of construction. However, the demand for longer spans and sustainability in bridge construction has prompted the use of higher-performance and lower-carbon-emitting materials in constructions. Materials like Ultra-High Performance Concrete (UHPC) offer high levels of strength and durability to the bridges, while Ground Granulated Blast Furnace Slag (GGBFS) reduces the amount of cement. This study investigates the use of UHPC with GGBFS in PCI girder bridges. A comparison between a conventional concrete two-span bridge and a UHPC with GGBFS single-span bridge is conducted, including their structure, the amount of material required for construction, construction costs, carbon emissions, and construction duration. The structural analysis of the bridges was performed using Midas Civil 2025. Material take-off and cost estimation was performed using Indonesian Unit Price Analysis (called Analisis Harga Satuan Pekerjaan or AHSP). The environmental impact was assessed through cradle-to-gate Life Cycle Assessment (LCA) analysis. The results indicate that the use of UHPC with GGBFS allows for a single-span bridge of the same dimensions as the two-span concrete bridge, whereby it requires less reinforcement and reduces carbon emissions of 9.77% due to the elimination of the middle pier. While construction costs for the UHPC with GGBFS bridge are higher, construction time is shortened from 51 to 38 weeks due to the elimination of the bridge pier. Overall, the use of UHPC with GGBFS provides structural, sustainability, and construction time benefits but at a higher cost.

Authors

Institutions

Publication Details

Journal
Journal of Building Material Science
Published
2026-11-24
DOI
https://doi.org/10.30564/jbms.v8i4.117338
Primary Topic
Civil and Structural Engineering Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Comparative Analysis between Conventional Concrete and UHPC with GGBFS in PCI Girder Bridge Construction

Andy Prabowo, Timotius Alfanov, Fransiscus Xaverius Supartono
Journal of Building Material Science
Civil and Structural Engineering Research
article

Comparative Analysis between Conventional Concrete and UHPC with GGBFS in PCI Girder Bridge Construction

Andy Prabowo, Timotius Alfanov, Fransiscus Xaverius Supartono
article en

Abstract

Precast Concrete I-Girder (PCI girder) bridges are typically utilized for short to medium spans due to their ease of construction. However, the demand for longer spans and sustainability in bridge construction has prompted the use of higher-performance and lower-carbon-emitting materials in constructions. Materials like Ultra-High Performance Concrete (UHPC) offer high levels of strength and durability to the bridges, while Ground Granulated Blast Furnace Slag (GGBFS) reduces the amount of cement. This study investigates the use of UHPC with GGBFS in PCI girder bridges. A comparison between a conventional concrete two-span bridge and a UHPC with GGBFS single-span bridge is conducted, including their structure, the amount of material required for construction, construction costs, carbon emissions, and construction duration. The structural analysis of the bridges was performed using Midas Civil 2025. Material take-off and cost estimation was performed using Indonesian Unit Price Analysis (called Analisis Harga Satuan Pekerjaan or AHSP). The environmental impact was assessed through cradle-to-gate Life Cycle Assessment (LCA) analysis. The results indicate that the use of UHPC with GGBFS allows for a single-span bridge of the same dimensions as the two-span concrete bridge, whereby it requires less reinforcement and reduces carbon emissions of 9.77% due to the elimination of the middle pier. While construction costs for the UHPC with GGBFS bridge are higher, construction time is shortened from 51 to 38 weeks due to the elimination of the bridge pier. Overall, the use of UHPC with GGBFS provides structural, sustainability, and construction time benefits but at a higher cost.

Journal of Building Material ScienceVol. 8(4)
Tarumanagara University (ID)
Industry, innovation and infrastructure, Responsible consumption and production, Climate action, Sustainable cities and communities
Civil and Structural Engineering Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
Comparative Analysis between Conventional Concrete and UHPC with GGBFS in PCI Girder Bridge Construction — Andy Prabowo, Timotius Alfanov, et al. · Journal of Building Material Science (2026) | TGRS Research Map | TGRS