Coupled Hydromechanical Assessment of Wellbore Trajectory Curvature and Drilling Fluid Density at Multilateral Well Junctions

The junction between a main borehole and a lateral in deepwater, deep multilateral horizontal wells is characterized by abrupt geometric transitions, a thin intervening rock web, and overlapping stress disturbances. These features can induce local compressive-shear yielding and wellbore instability. This study investigates the effects of lateral trajectory curvature and drilling fluid density on the mechanical response of the rock web in a deep sandstone reservoir. A three-dimensional coupled pore-pressure–displacement finite element model of the main–lateral junction was developed using Biot poroelasticity, Darcy’s law, and the Mohr–Coulomb criterion. First, lateral build-up rates of 10.2, 15.2, and 20.2° per 30 m were compared at a fixed drilling fluid density. Next, densities from 1.07 to 1.19 g/cm3 were evaluated at a fixed build-up rate of 20.2° per 30 m. A continuous plastic zone defined by equivalent plastic strain (PEEQ) and directly connected to the borehole wall was used as a numerical indicator of potential instability; its transverse width and longitudinal extent were measured. Plastic yielding was concentrated near the main–lateral junction and the tip of the rock web. When the build-up rate increased from 10.2 to 20.2° per 30 m, the connected plastic-zone width increased from 0.053 to 0.092 m, whereas its longitudinal extent decreased from 0.340 to 0.192 m (a 43.5% reduction). This wider-but-shorter pattern may be associated with more rapid thickening of the rock web and a shorter interval of overlapping borehole-induced stress disturbances. At a build-up rate of 20.2° per 30 m, increasing the drilling fluid density from 1.07 to 1.19 g/cm3 reduced the width from 0.130 to 0.087 m and the longitudinal extent from 0.370 to 0.184 m, indicating a contraction of the connected plastic zone for the conditions examined. The study evaluates curvature and fluid-density effects through two separate one-factor hydromechanical comparisons of the PEEQ plastic zone and pore pressure (POR) field. Neither joint trajectory–density optimization nor the determination of optimal drilling parameters is attempted.

Authors

Institutions

Publication Details

Journal
Processes
Published
2026-11-24
DOI
https://doi.org/10.3390/pr14233771
Primary Topic
Drilling and Well Engineering
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Coupled Hydromechanical Assessment of Wellbore Trajectory Curvature and Drilling Fluid Density at Multilateral Well Junctions

Rui Dai, Ming Luo, Zilong Gong, Haowei Feng et al.
1 links
Processes
Drilling and Well Engineering
article

Coupled Hydromechanical Assessment of Wellbore Trajectory Curvature and Drilling Fluid Density at Multilateral Well Junctions

Rui Dai, Ming Luo, Zilong Gong, Haowei Feng, Chuanliang Yan, Aopeng Zhang, Xuanhua Zhu, Donglei Jiang
article en

Abstract

The junction between a main borehole and a lateral in deepwater, deep multilateral horizontal wells is characterized by abrupt geometric transitions, a thin intervening rock web, and overlapping stress disturbances. These features can induce local compressive-shear yielding and wellbore instability. This study investigates the effects of lateral trajectory curvature and drilling fluid density on the mechanical response of the rock web in a deep sandstone reservoir. A three-dimensional coupled pore-pressure–displacement finite element model of the main–lateral junction was developed using Biot poroelasticity, Darcy’s law, and the Mohr–Coulomb criterion. First, lateral build-up rates of 10.2, 15.2, and 20.2° per 30 m were compared at a fixed drilling fluid density. Next, densities from 1.07 to 1.19 g/cm3 were evaluated at a fixed build-up rate of 20.2° per 30 m. A continuous plastic zone defined by equivalent plastic strain (PEEQ) and directly connected to the borehole wall was used as a numerical indicator of potential instability; its transverse width and longitudinal extent were measured. Plastic yielding was concentrated near the main–lateral junction and the tip of the rock web. When the build-up rate increased from 10.2 to 20.2° per 30 m, the connected plastic-zone width increased from 0.053 to 0.092 m, whereas its longitudinal extent decreased from 0.340 to 0.192 m (a 43.5% reduction). This wider-but-shorter pattern may be associated with more rapid thickening of the rock web and a shorter interval of overlapping borehole-induced stress disturbances. At a build-up rate of 20.2° per 30 m, increasing the drilling fluid density from 1.07 to 1.19 g/cm3 reduced the width from 0.130 to 0.087 m and the longitudinal extent from 0.370 to 0.184 m, indicating a contraction of the connected plastic zone for the conditions examined. The study evaluates curvature and fluid-density effects through two separate one-factor hydromechanical comparisons of the PEEQ plastic zone and pore pressure (POR) field. Neither joint trajectory–density optimization nor the determination of optimal drilling parameters is attempted.

ProcessesVol. 14(23)
China National Offshore Oil Corporation (China) (CN), China University of Petroleum, East China (CN)
China National Offshore Oil Corporation
Drilling and Well Engineering
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon