Coupled Hydromechanical Assessment of Wellbore Trajectory Curvature and Drilling Fluid Density at Multilateral Well Junctions
The junction between a main borehole and a lateral in deepwater, deep multilateral horizontal wells is characterized by abrupt geometric transitions, a thin intervening rock web, and overlapping stress disturbances. These features can induce local compressive-shear yielding and wellbore instability. This study investigates the effects of lateral trajectory curvature and drilling fluid density on the mechanical response of the rock web in a deep sandstone reservoir. A three-dimensional coupled pore-pressure–displacement finite element model of the main–lateral junction was developed using Biot poroelasticity, Darcy’s law, and the Mohr–Coulomb criterion. First, lateral build-up rates of 10.2, 15.2, and 20.2° per 30 m were compared at a fixed drilling fluid density. Next, densities from 1.07 to 1.19 g/cm3 were evaluated at a fixed build-up rate of 20.2° per 30 m. A continuous plastic zone defined by equivalent plastic strain (PEEQ) and directly connected to the borehole wall was used as a numerical indicator of potential instability; its transverse width and longitudinal extent were measured. Plastic yielding was concentrated near the main–lateral junction and the tip of the rock web. When the build-up rate increased from 10.2 to 20.2° per 30 m, the connected plastic-zone width increased from 0.053 to 0.092 m, whereas its longitudinal extent decreased from 0.340 to 0.192 m (a 43.5% reduction). This wider-but-shorter pattern may be associated with more rapid thickening of the rock web and a shorter interval of overlapping borehole-induced stress disturbances. At a build-up rate of 20.2° per 30 m, increasing the drilling fluid density from 1.07 to 1.19 g/cm3 reduced the width from 0.130 to 0.087 m and the longitudinal extent from 0.370 to 0.184 m, indicating a contraction of the connected plastic zone for the conditions examined. The study evaluates curvature and fluid-density effects through two separate one-factor hydromechanical comparisons of the PEEQ plastic zone and pore pressure (POR) field. Neither joint trajectory–density optimization nor the determination of optimal drilling parameters is attempted.
Authors
- Rui Dai (ORCID: https://orcid.org/0000-0001-9906-5709)
- Ming Luo (ORCID: https://orcid.org/0000-0002-8987-5019)
- Zilong Gong
- Haowei Feng
- Chuanliang Yan
- Aopeng Zhang
- Xuanhua Zhu
- Donglei Jiang
Institutions
- China National Offshore Oil Corporation (China) (CN)
- China University of Petroleum, East China (CN)
Publication Details
- Journal
- Processes
- Published
- 2026-11-24
- DOI
- https://doi.org/10.3390/pr14233771
- Primary Topic
- Drilling and Well Engineering
- Type
- article
- Field-Weighted Citation Impact
- 0.00
Funders
- China National Offshore Oil Corporation