Civil Law Consequences of Non-Performance of the Obligation to Maintain Readiness of Generating Equipment in the Wholesale Capacity Market
The article examines the relationship between financial settlement and protective consequences of breaching the obligation to maintain the generating equipment in readiness to produce electricity in the wholesale capaci-ty market. Drawing on the Civil Code of the Russian Federation, the Federal Law “On the Electric Power Indus-try”, the Wholesale Market Rules, Russian-language studies of 2018–2024, court decisions of 2024–2026, and System Operator data of United Energy System, four financial consequences of non-performance are distin-guished: determination of the paid volume of capacity, contractual penalty, compensation of damages, and payment for withdrawal from future supply. It is revealed that a reduction in a generator revenue is often treated as a single liability measure, although its components differ in legal nature. Four criteria of distinction are pro-posed: payment basis, calculation base, recipient and the period of protected performance. The need for sepa-rate reflection of settlement adjustment and penalties in the settlement documents and the materials of the independent proof of causation when recovering generator losses from a contractor in the capacity market is noted. The special procedure of applying a zero coefficient to unavailability indicators of damaged equipment introduced into the Wholesale Market Rules in 2026 is taken into account. It is concluded that the legal regime of a financial settlement consequence is determined by its function and legal ground rather than by the name of the payment or the method of its calculation.
Authors
- Evgeniy V. Khablak
Publication Details
- Journal
- Теория и практика общественного развития
- Published
- 2026-11-25
- DOI
- https://doi.org/10.24158/tipor.2026.10.21
- Primary Topic
- Energy Law and Policy
- Type
- article
- Field-Weighted Citation Impact
- 0.00