Small Modular Reactors for AI Data Centers: An Energy Feasibility Study

Artificial intelligence data centers need large amounts of firm electricity. The companies that build them have turned to nuclear power in public. This review asks whether small modular reactors (SMRs) can meet that need, and on what timescale. It draws on demand forecasts, hyperscaler agreements, licensing records, cost models, fuel supply evidence, grid queue data, and alternatives. United States data centers used 176 TWh in 2023, about 4.4 percent of national electricity. The Lawrence Berkeley National Laboratory 2025 Update puts the 2030 Reference Case at 649 TWh, with a range of 521 to 843 TWh. The signed SMR frameworks are real: Google with Kairos Power for up to 500 MWe by 2035, Amazon with X-energy for a 320 MWe first project and a 5 GW aim by 2039, Meta with TerraPower for up to 2.8 GW, and Meta with Oklo for a 1.2 GW campus. None of those reactors is operating. The only United States construction permits for SMR and advanced reactor projects in hand are Kairos Hermes and Hermes 2, TerraPower Kemmerer Unit 1, Tennessee Valley Authority Clinch River Unit 1, and Dow and X-energy Long Mott Generating Station. Costs are first-of-a-kind and uncertain. Modelled overnight costs near 6,200 dollars per kW fall only after 10 to 20 repeated builds. The one fully priced United States SMR project, NuScale and Utah Associated Municipal Power Systems, was cancelled in 2023 after its cost rose to 9.3 billion dollars. High-assay low-enriched uranium supply sits at demonstration scale. Behind-the-meter siting did not remove grid and regulatory risk. The verdict is conditional. SMRs are a credible long-horizon option for AI data-center power in the 2030s if permits, fuel, and cost learning hold. They are not a near-term fix. They are not proven today.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-24
DOI
https://doi.org/10.5281/zenodo.24488309
Primary Topic
Nuclear reactor physics and engineering
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Small Modular Reactors for AI Data Centers: An Energy Feasibility Study

Artem Melnyk
6 links
Zenodo (CERN European Organization for Nuclear Research)
Nuclear reactor physics and engineering
article

Small Modular Reactors for AI Data Centers: An Energy Feasibility Study

Artem Melnyk
article en

Abstract

Artificial intelligence data centers need large amounts of firm electricity. The companies that build them have turned to nuclear power in public. This review asks whether small modular reactors (SMRs) can meet that need, and on what timescale. It draws on demand forecasts, hyperscaler agreements, licensing records, cost models, fuel supply evidence, grid queue data, and alternatives. United States data centers used 176 TWh in 2023, about 4.4 percent of national electricity. The Lawrence Berkeley National Laboratory 2025 Update puts the 2030 Reference Case at 649 TWh, with a range of 521 to 843 TWh. The signed SMR frameworks are real: Google with Kairos Power for up to 500 MWe by 2035, Amazon with X-energy for a 320 MWe first project and a 5 GW aim by 2039, Meta with TerraPower for up to 2.8 GW, and Meta with Oklo for a 1.2 GW campus. None of those reactors is operating. The only United States construction permits for SMR and advanced reactor projects in hand are Kairos Hermes and Hermes 2, TerraPower Kemmerer Unit 1, Tennessee Valley Authority Clinch River Unit 1, and Dow and X-energy Long Mott Generating Station. Costs are first-of-a-kind and uncertain. Modelled overnight costs near 6,200 dollars per kW fall only after 10 to 20 repeated builds. The one fully priced United States SMR project, NuScale and Utah Associated Municipal Power Systems, was cancelled in 2023 after its cost rose to 9.3 billion dollars. High-assay low-enriched uranium supply sits at demonstration scale. Behind-the-meter siting did not remove grid and regulatory risk. The verdict is conditional. SMRs are a credible long-horizon option for AI data-center power in the 2030s if permits, fuel, and cost learning hold. They are not a near-term fix. They are not proven today.

Zenodo (CERN European Organization for Nuclear Research)
Affordable and clean energy, Industry, innovation and infrastructure, Climate action
Nuclear reactor physics and engineering
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
Small Modular Reactors for AI Data Centers: An Energy Feasibility Study — Artem Melnyk · Zenodo (CERN European Organization for Nuclear Research) (2026) | TGRS Research Map | TGRS