Project management in emergency slope stabilization works: the Estrada da Graciosa case (PR-410, Morretes, Paraná)

Between November 2022 and February 2023, intense rainfall in the Serra do Mar mountain rangetriggered landslides at six locations along the Estrada da Graciosa (PR-410), a historic road inMorretes, Paraná, Brazil, damaging slopes both above and below the roadway and forcing roadclosures. The Paraná State Highway Department (DER/PR) awarded an emergency design-and-buildcontract for slope stabilization (Contract No. 014/2023, initial value of BRL 39.0 million). Fieldworks were completed in December 2023, and the contract was closed in February 2024. This paperexamines the case from a project management perspective, drawing on the seven performancedomains and six principles of the PMBOK® Guide – Eighth Edition and on the ConstructionExtension to the PMBOK® Guide. It describes the geotechnical solutions adopted (anchored wallsover jet-grouting columns, vegetated soil nailing, shotcrete facing and deep horizontal drains) and themanagement method applied: an integrated system for managing execution, productivity and contractperformance, combined with a per-site critical cycle and a monthly measurement routine. The resultsshow that the method made it possible to run five simultaneous work fronts while keeping the roadopen, to limit the only scheduled full closure to three days, and to close the contract with fullyreconciled measurements. The paper argues that, on roads that sustain a regional economy, thequality of project management determines how long traffic is restricted. Its effects therefore reachbeyond the client and the contractor, to local businesses and tourism, to public administration and tothe construction sector. The article also discusses the relevance of these practices to publicemergency infrastructure recovery programs, such as the Federal Highway Administration'sEmergency Relief program in the United States, where oversight bodies have identified thedocumentation of decisions as a weak point.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-24
DOI
https://doi.org/10.5281/zenodo.24498174
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Project management in emergency slope stabilization works: the Estrada da Graciosa case (PR-410, Morretes, Paraná)

Emanuel Augusto Valle
1 links
Zenodo (CERN European Organization for Nuclear Research)
Construction Project Management and Performance
article

Project management in emergency slope stabilization works: the Estrada da Graciosa case (PR-410, Morretes, Paraná)

Emanuel Augusto Valle
article en

Abstract

Between November 2022 and February 2023, intense rainfall in the Serra do Mar mountain rangetriggered landslides at six locations along the Estrada da Graciosa (PR-410), a historic road inMorretes, Paraná, Brazil, damaging slopes both above and below the roadway and forcing roadclosures. The Paraná State Highway Department (DER/PR) awarded an emergency design-and-buildcontract for slope stabilization (Contract No. 014/2023, initial value of BRL 39.0 million). Fieldworks were completed in December 2023, and the contract was closed in February 2024. This paperexamines the case from a project management perspective, drawing on the seven performancedomains and six principles of the PMBOK® Guide – Eighth Edition and on the ConstructionExtension to the PMBOK® Guide. It describes the geotechnical solutions adopted (anchored wallsover jet-grouting columns, vegetated soil nailing, shotcrete facing and deep horizontal drains) and themanagement method applied: an integrated system for managing execution, productivity and contractperformance, combined with a per-site critical cycle and a monthly measurement routine. The resultsshow that the method made it possible to run five simultaneous work fronts while keeping the roadopen, to limit the only scheduled full closure to three days, and to close the contract with fullyreconciled measurements. The paper argues that, on roads that sustain a regional economy, thequality of project management determines how long traffic is restricted. Its effects therefore reachbeyond the client and the contractor, to local businesses and tourism, to public administration and tothe construction sector. The article also discusses the relevance of these practices to publicemergency infrastructure recovery programs, such as the Federal Highway Administration'sEmergency Relief program in the United States, where oversight bodies have identified thedocumentation of decisions as a weak point.

Zenodo (CERN European Organization for Nuclear Research)
Sustainable cities and communities, Industry, innovation and infrastructure
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
Project management in emergency slope stabilization works: the Estrada da Graciosa case (PR-410, Morretes, Paraná) — Emanuel Augusto Valle · Zenodo (CERN European Organization for Nuclear Research) (2026) | TGRS Research Map | TGRS