Zero-Emission Data Center Infrastructure: Investor & Project Finance Memorandum
Zero-Emission Data Center Infrastructure: Investor & Project Finance Memorandum (Version 7.3) Companion Commercial & Financial Edition to Technical Blueprint v7.1 (DOI: 10.5281/zenodo.24475273) This memorandum presents the commercial deployment strategy, phased infrastructure cutaways, and 100 MW reference financial model for a water-sovereign, zero-emission AI and cloud data center campus. Engineered around 100% on-site fluid sovereignty (zero external water piping or evaporative cooling loss) and a compact ~4.5-acre vertical Core Campus (Zone A), the architecture eliminates multi-year utility interconnection queues through a flanking two-zone power strategy: below-grade Small Modular Reactors (Zone B-1) provide immediate 24/7 baseload power and thermal integration during Years 1–3 while closed-loop directional geothermal wells and perimeter solar arrays (Zone B-2) are constructed. Once permanent geothermal and solar generation is online, the campus offers two bankable end-state operating paths: Option A (Dual-Source Utility Export), retaining both power complexes where permitted to export 120 MWe of clean nuclear baseload power to the public grid for +$65M–$95M/yr in added revenue, or Option B (Modular SMR Redeployment), relocating the SMRs to jump-start a second campus and recovering $650M–$950M in capital outlay. Includes preliminary 100 MW CAPEX/OPEX comparisons, sequential transition economics, phased engineering cutaways, and implementation milestones.
Authors
- Mathew R. Eckhardt
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2026-11-23
- DOI
- https://doi.org/10.5281/zenodo.24480858
- Primary Topic
- Hybrid Renewable Energy Systems
- Type
- article
- Field-Weighted Citation Impact
- 0.00