Complete Network Assessment of Road Disruption and Heuristic Pipe Sizing in a Mountainous Transport Hub
Pipe enlargement can change hydraulic performance without producing a corresponding change in road availability. This study coupled a complete SWMM dual-drainage model of the Chongqing East Station area, containing 560 original stormwater pipes, with a physical-road graph of 577 nodes and 605 roads. For R50, R100 and R200 rainfall scenarios, the maximum numbers of roads closed at a 0.30 m mean-depth threshold were 13, 16 and 21, respectively. The corresponding blocked-road length–time losses were 0.3049, 0.3510 and 0.4105 km·h. Five successive R200 pipe-enlargement states were then compared with the baseline using a fixed score dominated by cumulative nodal overflow. All five states increased this score, so the baseline was retained. However, several enlargement states reduced road disruption; state 5 reduced length–time loss by 7.06% at the 0.30 m threshold. At a shallower 0.15 m threshold, some enlargement states increased road disruption. The three road-depth definitions also produced different cumulative losses, although no road in the three baseline cases exceeded 0.30 m at 360 min. These results show how the choice of evaluation measure can change the assessment of pipe enlargement and support considering road-network effects in drainage planning.
Authors
- Wei Yinghua
- 母德伟
- Lihua Deng
- Jinchao He
- Qin Zhou
- Hao Lu
- Lei Chen
Institutions
- Chongqing University (CN)
- Chongqing Jiaotong University (CN)
Publication Details
- Journal
- Water
- Published
- 2026-11-23
- DOI
- https://doi.org/10.3390/w18232925
- Primary Topic
- Urban Stormwater Management Solutions
- Type
- article
- Field-Weighted Citation Impact
- 0.00