Project Planning and Scheduling Systems, Monitoring and Reporting Systems and Performance of Rural Road Infrastructure Projects in Kiambu County, Kenya

The performance of rural road infrastructure projects in Kenya continues to face challenges such as project delays, cost overruns, weak monitoring systems and quality-related concerns. Project Management Information Systems (PMIS) provide tools that can improve project planning, monitoring and overall project performance. This study examined the influence of project planning and scheduling systems and monitoring and reporting systems on the performance of rural road infrastructure projects in Kiambu County, Kenya. The study was anchored on the Technology Acceptance Model and the Information Systems Success Model. A descriptive survey research design with a quantitative approach was adopted. The target population comprised 360 respondents drawn from 24 rural road infrastructure projects across the 12 sub-counties of Kiambu County. A sample of 189 respondents was determined using Yamane's formula and selected through stratified and simple random sampling. Data were collected using structured questionnaires, of which 175 were returned, representing a response rate of 92.6%. Data were analysed using descriptive statistics, Pearson correlation and multiple regression with the aid of SPSS Version 27. Project planning and scheduling systems (r = 0.620) and monitoring and reporting systems (r = 0.680) had strong positive correlations with project performance. The two variables jointly explained 54.9% of the variation in project performance (R² = 0.549, F = 104.756, p < 0.05). Monitoring and reporting systems (B = 0.516, Beta = 0.486, p < 0.05) had a greater influence on project performance than project planning and scheduling systems (B = 0.385, Beta = 0.353, p < 0.05). The study concluded that effective use of planning, scheduling, monitoring and reporting systems improves the coordination, control and timely delivery of rural road projects. It recommended structured project schedules with monthly schedule reviews, standardised digital progress reporting, and project monitoring dashboards supported by verified site evidence. Keywords: Project Management Information Systems, Project Planning and Scheduling, Monitoring and Reporting, Project Performance, Rural Roads, Kiambu County

Authors

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-23
DOI
https://doi.org/10.5281/zenodo.24473781
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Project Planning and Scheduling Systems, Monitoring and Reporting Systems and Performance of Rural Road Infrastructure Projects in Kiambu County, Kenya

Mbutu, Phylis, Nyanjui Nelson Warui
Zenodo (CERN European Organization for Nuclear Research)
Construction Project Management and Performance
article

Project Planning and Scheduling Systems, Monitoring and Reporting Systems and Performance of Rural Road Infrastructure Projects in Kiambu County, Kenya

Mbutu, Phylis, Nyanjui Nelson Warui
article en

Abstract

The performance of rural road infrastructure projects in Kenya continues to face challenges such as project delays, cost overruns, weak monitoring systems and quality-related concerns. Project Management Information Systems (PMIS) provide tools that can improve project planning, monitoring and overall project performance. This study examined the influence of project planning and scheduling systems and monitoring and reporting systems on the performance of rural road infrastructure projects in Kiambu County, Kenya. The study was anchored on the Technology Acceptance Model and the Information Systems Success Model. A descriptive survey research design with a quantitative approach was adopted. The target population comprised 360 respondents drawn from 24 rural road infrastructure projects across the 12 sub-counties of Kiambu County. A sample of 189 respondents was determined using Yamane's formula and selected through stratified and simple random sampling. Data were collected using structured questionnaires, of which 175 were returned, representing a response rate of 92.6%. Data were analysed using descriptive statistics, Pearson correlation and multiple regression with the aid of SPSS Version 27. Project planning and scheduling systems (r = 0.620) and monitoring and reporting systems (r = 0.680) had strong positive correlations with project performance. The two variables jointly explained 54.9% of the variation in project performance (R² = 0.549, F = 104.756, p < 0.05). Monitoring and reporting systems (B = 0.516, Beta = 0.486, p < 0.05) had a greater influence on project performance than project planning and scheduling systems (B = 0.385, Beta = 0.353, p < 0.05). The study concluded that effective use of planning, scheduling, monitoring and reporting systems improves the coordination, control and timely delivery of rural road projects. It recommended structured project schedules with monthly schedule reviews, standardised digital progress reporting, and project monitoring dashboards supported by verified site evidence. Keywords: Project Management Information Systems, Project Planning and Scheduling, Monitoring and Reporting, Project Performance, Rural Roads, Kiambu County

Zenodo (CERN European Organization for Nuclear Research)
Jomo Kenyatta University of Agriculture and Technology (KE)
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon