Construction Dispute Prediction: Decision-Making Support Based on Explainable Machine Learning

Construction disputes significantly hinder project performance, causing delays and cost overruns. Predicting construction dis‍putes accurately and interpreting the contributing factors transparently is crucial. To address these practical challenges, this research identifies 13 factors influencing construction disputes through a literature review, collects a data set of 222 project cases through expert interviews and adjudication cases published by the Supreme People’s Court in China, and employs six machine learning algorithms integrating Shapley additive explanations (SHAP) for interpretability. Additionally, we employed the synthetic minority oversampling technique (SMOTE) to address data imbalance, resulting in a balanced data set that enhanced the model’s generalization performance. Results showed that the extreme gradient boosting (XGBoost) algorithm provides the highest accuracy at 95.95% for construction dispute prediction, and the three most significant influential factors of construction disputes are willingness for future cooperation, stable cash flow, and project scale. This predictive model identifies the most suitable machine learning model and provides transparent insights, empowering practitioners to manage and mitigate construction disputes effectively. It is worth emphasizing that the integration of interpretable machine learning techniques within the context of construction dispute prediction not only enhances the model’s interpretability and generalization capabilities but also reveals the primary causes of disputes. This provides valuable insights for decision makers to formulate proactive intervention strategies. Furthermore, unlike in other fields, this study not only predicts the occurrence of disputes but also emphasizes identifying the underlying causes. Applying interpretable machine learning techniques to construction disputes enables clear attribution of the factors driving such conflicts and offers actionable insights for practitioners. For the construction industry, this prediction–interpretation–action closed-loop management approach offers greater practical value than merely producing probabilistic outputs.

Authors

Institutions

Publication Details

Journal
Journal of Construction Engineering and Management
Published
2026-11-23
DOI
https://doi.org/10.1061/jcemd4.coeng-18303
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Construction Dispute Prediction: Decision-Making Support Based on Explainable Machine Learning

Maria Mikela Chatzimichailidou, Shaowei Tian, Yuchun Tang, Miroslaw Jan Skibniewski et al.
Journal of Construction Engineering and Management
Construction Project Management and Performance
article

Construction Dispute Prediction: Decision-Making Support Based on Explainable Machine Learning

Maria Mikela Chatzimichailidou, Shaowei Tian, Yuchun Tang, Miroslaw Jan Skibniewski, Guanqiao Zhang, Xuan Xie
article en

Abstract

Construction disputes significantly hinder project performance, causing delays and cost overruns. Predicting construction dis‍putes accurately and interpreting the contributing factors transparently is crucial. To address these practical challenges, this research identifies 13 factors influencing construction disputes through a literature review, collects a data set of 222 project cases through expert interviews and adjudication cases published by the Supreme People’s Court in China, and employs six machine learning algorithms integrating Shapley additive explanations (SHAP) for interpretability. Additionally, we employed the synthetic minority oversampling technique (SMOTE) to address data imbalance, resulting in a balanced data set that enhanced the model’s generalization performance. Results showed that the extreme gradient boosting (XGBoost) algorithm provides the highest accuracy at 95.95% for construction dispute prediction, and the three most significant influential factors of construction disputes are willingness for future cooperation, stable cash flow, and project scale. This predictive model identifies the most suitable machine learning model and provides transparent insights, empowering practitioners to manage and mitigate construction disputes effectively. It is worth emphasizing that the integration of interpretable machine learning techniques within the context of construction dispute prediction not only enhances the model’s interpretability and generalization capabilities but also reveals the primary causes of disputes. This provides valuable insights for decision makers to formulate proactive intervention strategies. Furthermore, unlike in other fields, this study not only predicts the occurrence of disputes but also emphasizes identifying the underlying causes. Applying interpretable machine learning techniques to construction disputes enables clear attribution of the factors driving such conflicts and offers actionable insights for practitioners. For the construction industry, this prediction–interpretation–action closed-loop management approach offers greater practical value than merely producing probabilistic outputs.

Journal of Construction Engineering and ManagementVol. 153(2)
Chaoyang University of Technology (TW), Dongbei University of Finance and Economics (CN), National University of Singapore (SG), Hainan University (CN), Jilin Jianzhu University (CN), University College London (GB), University of Maryland, College Park (US), Polish Academy of Sciences (PL)
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon