Hill Dickinson Stadium for Everton Football Club: geotechnical dock preparation and infill design

Everton Football Club’s Hill Dickinson Stadium has been built on the site of Bramley-Moore Dock, Liverpool. This paper focuses on the dock infill and the associated geotechnical challenges. A baseline option would have been to remove existing soft dock deposits before infilling. However, the alternative of retaining dock deposits prior to infilling was more sustainable and reduced the programme duration. Three locations were sampled for sea-dredged sand to infill the dock. Oedometer and triaxial tests were undertaken using preparation methods that replicated the proposed dock filling process (a) sand dynamically compacted at the surface (b) sand falling loosely through water but affected by compaction and (c) sand falling loosely through the water but not affected by compaction. Results of the different sample areas were compared and creep settlement of the chosen site-winning location was calculated. This was combined with settlement estimates of the dock deposits to conclude the anticipated total settlement during construction and stadium design life. The paper describes the analysis and design undertaken to prove the feasibility of retaining the dock deposits through quantifying the magnitude and rate of settlement during construction and the design life of the stadium.

Authors

Institutions

Publication Details

Journal
Proceedings of the Institution of Civil Engineers - Civil Engineering
Published
2026-11-25
DOI
https://doi.org/10.1680/jcien.25.00616
Primary Topic
Geotechnical Engineering and Soil Stabilization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Hill Dickinson Stadium for Everton Football Club: geotechnical dock preparation and infill design

P. Scott, Peter Scott, Jonathan Rowe
Proceedings of the Institution of Civil Engineers - Civil Engineering
Geotechnical Engineering and Soil Stabilization
article

Hill Dickinson Stadium for Everton Football Club: geotechnical dock preparation and infill design

P. Scott, Peter Scott, Jonathan Rowe
article en

Abstract

Everton Football Club’s Hill Dickinson Stadium has been built on the site of Bramley-Moore Dock, Liverpool. This paper focuses on the dock infill and the associated geotechnical challenges. A baseline option would have been to remove existing soft dock deposits before infilling. However, the alternative of retaining dock deposits prior to infilling was more sustainable and reduced the programme duration. Three locations were sampled for sea-dredged sand to infill the dock. Oedometer and triaxial tests were undertaken using preparation methods that replicated the proposed dock filling process (a) sand dynamically compacted at the surface (b) sand falling loosely through water but affected by compaction and (c) sand falling loosely through the water but not affected by compaction. Results of the different sample areas were compared and creep settlement of the chosen site-winning location was calculated. This was combined with settlement estimates of the dock deposits to conclude the anticipated total settlement during construction and stadium design life. The paper describes the analysis and design undertaken to prove the feasibility of retaining the dock deposits through quantifying the magnitude and rate of settlement during construction and the design life of the stadium.

Proceedings of the Institution of Civil Engineers - Civil Engineering
BuroHappold (United Kingdom) (GB)
Sustainable cities and communities, Industry, innovation and infrastructure
Geotechnical Engineering and Soil Stabilization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon