Cyclic Industrial Symbiosis: A Lean Proof of the N-Partner Product Condition

Working paper, not peer reviewed. Nothing in this record is field-validated. Scope and novelty. Project P3 states and proves the formal core of a circular-economy kernel for Viridis OS: loop mass balance, cascaded recovery, a recovery-adjusted work floor and an N-partner symbiosis condition. These are elementary accounting and inequality results about the stated models, not new theorems. The N-partner condition generalises the two-partner Reciprocity Corridor (doi:10.5281/zenodo.21971047), and the work floor extends the Useful and Dissipated Work Ledger (doi:10.5281/zenodo.22736716). We have not searched the literature exhaustively and claim no novelty. Each result holds only inside its stated model. It says nothing about any measured recovery rate, retention, cost, value or material, about whether deployed kernel code implements the rule faithfully, or about any environmental outcome. The work floor is a bound on modelled efficiency; it is not a Landauer bound and does not rely on the Intelligence Bound, which remains a conjecture. N >= 2 firms are arranged in a cycle. Firm i ships a by-product flow x_i to its successor at unit cost c_i > 0 and receives its predecessor's flow, worth v_i > 0 per unit to it, so its net benefit is v_i x_{i-1} - c_i x_i (indices mod N). We give a Lean 4 proof, against Mathlib, of the sealed statement P3.CyclicSymbiosis: a strictly positive flow giving every firm a strictly positive net benefit exists if and only if prod c_i < prod v_i. Necessity follows by multiplying the N strict inequalities c_i x_i < v_i x_{i-1} and cancelling prod x_i, which is possible because the predecessor map is a bijection of the cycle. For sufficiency we construct an explicit flow. With s = (prod v / prod c)^(1/N) > 1, each link carries the ratio x_i/x_{i-1} = v_i/(c_i s), these ratios multiply to one around the cycle, and each firm keeps the fraction 1 - 1/s of the value it receives. For N = 2 the statement reduces to the Reciprocity Corridor's product condition c_X c_Y < v_X v_Y (Run-128), and we include a Lean derivation of the two-partner feasibility test from the N-partner theorem. The result is a statement about a linear, one-period model. It says nothing about real costs, values, logistics, contracts or how gains are shared. Verification. a Lean 4 proof of P3.CyclicSymbiosis, a statement fixed before the proof attempt, machine-checked against Mathlib and replayed through the Lean kernel using only the standard axioms Run record, certification page and reproducible package: https://github.com/jdhart81/viridis-research/tree/main/runs/2026-11-18_P3 AI use: this version was drafted by an AI research agent (Claude, by Anthropic) running the Viridis research engine. Formal claims are checked by the Lean 4 kernel, empirical claims by re-running their analysis in a sandbox, and all are labelled by an automated verifier. The agent may call the Aristotle prover (Harmonic) for help with proof search; a proof counts only if the Lean kernel accepts it. Justin D. Hart directs the research and is the accountable author. No AI system is listed as an author or contributor, which Zenodo does not allow.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-23
DOI
https://doi.org/10.5281/zenodo.24456120
Primary Topic
Sustainable Industrial Ecology
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
preprint

Cyclic Industrial Symbiosis: A Lean Proof of the N-Partner Product Condition

Justin Hart
Zenodo (CERN European Organization for Nuclear Research)
Sustainable Industrial Ecology
preprint

Cyclic Industrial Symbiosis: A Lean Proof of the N-Partner Product Condition

Justin Hart
preprint en

Abstract

Working paper, not peer reviewed. Nothing in this record is field-validated. Scope and novelty. Project P3 states and proves the formal core of a circular-economy kernel for Viridis OS: loop mass balance, cascaded recovery, a recovery-adjusted work floor and an N-partner symbiosis condition. These are elementary accounting and inequality results about the stated models, not new theorems. The N-partner condition generalises the two-partner Reciprocity Corridor (doi:10.5281/zenodo.21971047), and the work floor extends the Useful and Dissipated Work Ledger (doi:10.5281/zenodo.22736716). We have not searched the literature exhaustively and claim no novelty. Each result holds only inside its stated model. It says nothing about any measured recovery rate, retention, cost, value or material, about whether deployed kernel code implements the rule faithfully, or about any environmental outcome. The work floor is a bound on modelled efficiency; it is not a Landauer bound and does not rely on the Intelligence Bound, which remains a conjecture. N >= 2 firms are arranged in a cycle. Firm i ships a by-product flow x_i to its successor at unit cost c_i > 0 and receives its predecessor's flow, worth v_i > 0 per unit to it, so its net benefit is v_i x_{i-1} - c_i x_i (indices mod N). We give a Lean 4 proof, against Mathlib, of the sealed statement P3.CyclicSymbiosis: a strictly positive flow giving every firm a strictly positive net benefit exists if and only if prod c_i < prod v_i. Necessity follows by multiplying the N strict inequalities c_i x_i < v_i x_{i-1} and cancelling prod x_i, which is possible because the predecessor map is a bijection of the cycle. For sufficiency we construct an explicit flow. With s = (prod v / prod c)^(1/N) > 1, each link carries the ratio x_i/x_{i-1} = v_i/(c_i s), these ratios multiply to one around the cycle, and each firm keeps the fraction 1 - 1/s of the value it receives. For N = 2 the statement reduces to the Reciprocity Corridor's product condition c_X c_Y < v_X v_Y (Run-128), and we include a Lean derivation of the two-partner feasibility test from the N-partner theorem. The result is a statement about a linear, one-period model. It says nothing about real costs, values, logistics, contracts or how gains are shared. Verification. a Lean 4 proof of P3.CyclicSymbiosis, a statement fixed before the proof attempt, machine-checked against Mathlib and replayed through the Lean kernel using only the standard axioms Run record, certification page and reproducible package: https://github.com/jdhart81/viridis-research/tree/main/runs/2026-11-18_P3 AI use: this version was drafted by an AI research agent (Claude, by Anthropic) running the Viridis research engine. Formal claims are checked by the Lean 4 kernel, empirical claims by re-running their analysis in a sandbox, and all are labelled by an automated verifier. The agent may call the Aristotle prover (Harmonic) for help with proof search; a proof counts only if the Lean kernel accepts it. Justin D. Hart directs the research and is the accountable author. No AI system is listed as an author or contributor, which Zenodo does not allow.

Zenodo (CERN European Organization for Nuclear Research)
Sustainable Industrial Ecology
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon