Intelligent Control and Metaheuristic Optimization for Renewable-based Fast EV Charging Stations
Fast-charging stations supplied by photovoltaic (PV) generation must regulate a common DC bus against intermittent generation and large, rapidly varying charging loads. This paper develops and analyses a grid-connected PV fast-charging station rated 1.755 MW, with a 1000 V DC bus, seven 80 kW chargers and a bidirectional three-level neutral-point-clamped grid converter. The station is described by an averaged dynamic model, formulated as an index-one differential-algebraic system with 47 states, from which the operating limits imposed by the system parameters are derived. The tuning of the proportional–integral (PI) controllers is stated as a constrained optimization problem with a time-weighted error cost, trajectory and stability constraints, and an existence argument for the optimal gains. The problem is solved with a Genetic Algorithm (GA), Particle Swarm Optimization (PSO) and the Grey Wolf Optimizer (GWO) under an identical evaluation budget. Perturb and Observe (P&O) and Incremental Conductance (INC) maximum power point tracking (MPPT) are compared on a 650 W module. Both achieve tracking efficiencies above 99.6 % and recover from irradiance steps within 3 ms, while INC removes the steady-state power oscillation of P&O (1.2 W peak-to-peak at 1000 W/m²). In the tuning runs, PSO and GWO reached the same best fitness within five iterations, whereas GA converged more slowly and ended 0.08 % higher after 50 generations.
Authors
- Fouad Zaro (ORCID: https://orcid.org/0000-0003-3107-0661)
Institutions
- Palestine Polytechnic University (PS)
Publication Details
- Journal
- WSEAS Transactions on Circuits and Systems archive
- Published
- 2026-11-23
- DOI
- https://doi.org/10.37394/23201.2026.25.39
- Primary Topic
- Photovoltaic System Optimization Techniques
- Type
- article
- Field-Weighted Citation Impact
- 0.00