Development of a Computerised Maintenance Management System for Enhancing the Availability Performance of Fibre to the Home Networks: A Case of TTCL, Dar es Salaam Region

Fibre to the Home (FTTH) networks are central to Tanzania's digital transformation agenda, yet the FTTH network operated by Tanzania Telecommunications Corporation Limited (TTCL) in the Dar es Salaam Region operates at approximately 91% availability, well below the 99.999% carrier-grade benchmark. Manual and fragmented maintenance practices, delayed fault communication between field technicians and the Network Operations Centre (NOC), and a predominantly reactive maintenance culture contribute to this gap. This study aimed to develop a Computerised Maintenance Management System (CMMS) for enhancing the availability performance of TTCL's FTTH network. A mixed-methods design integrated with a design science approach was adopted. Structured questionnaires were administered to 100 respondents drawn from 135 FTTH maintenance-related staff and were complemented by NOC fault logs and maintenance records. The Relative Importance Index (RII) was used to rank eleven factors, of which seven were significant, led by fibre cuts from civil works and excavation (RII = 0.918), field-to-NOC communication quality (RII = 0.912), and power outage at site (RII = 0.888). The seven significant factors were used to develop a multiple linear regression (MLR) maintenance management model using a 70/15/15 training, validation, and test split. The model explained 97.8% of the variance in availability performance in the training set, achieved R² = 0.983 on the test set with a mean absolute percentage error below 2.2%, and was significant overall (F = 387.37, p < 0.001). The validated model was embedded in a web-based, role-based CMMS prototype with modules for availability prediction, fault tickets, work orders, assets, preventive and corrective maintenance, inventory, reporting, and user management. All 35 functional test cases passed in a controlled environment. The study concludes that TTCL's availability challenges arise from measurable factors that can be computerised to support proactive, data-driven maintenance, and recommends pilot deployment followed by longitudinal evaluation.

Authors

Institutions

Publication Details

Journal
East African Journal of Engineering
Published
2026-11-23
DOI
https://doi.org/10.37284/eaje.9.2.6368
Primary Topic
Reliability and Maintenance Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Development of a Computerised Maintenance Management System for Enhancing the Availability Performance of Fibre to the Home Networks: A Case of TTCL, Dar es Salaam Region

Kenedy Aliila Greyson, Faustin Joseph
East African Journal of Engineering
Reliability and Maintenance Optimization
article

Development of a Computerised Maintenance Management System for Enhancing the Availability Performance of Fibre to the Home Networks: A Case of TTCL, Dar es Salaam Region

Kenedy Aliila Greyson, Faustin Joseph
article en

Abstract

Fibre to the Home (FTTH) networks are central to Tanzania's digital transformation agenda, yet the FTTH network operated by Tanzania Telecommunications Corporation Limited (TTCL) in the Dar es Salaam Region operates at approximately 91% availability, well below the 99.999% carrier-grade benchmark. Manual and fragmented maintenance practices, delayed fault communication between field technicians and the Network Operations Centre (NOC), and a predominantly reactive maintenance culture contribute to this gap. This study aimed to develop a Computerised Maintenance Management System (CMMS) for enhancing the availability performance of TTCL's FTTH network. A mixed-methods design integrated with a design science approach was adopted. Structured questionnaires were administered to 100 respondents drawn from 135 FTTH maintenance-related staff and were complemented by NOC fault logs and maintenance records. The Relative Importance Index (RII) was used to rank eleven factors, of which seven were significant, led by fibre cuts from civil works and excavation (RII = 0.918), field-to-NOC communication quality (RII = 0.912), and power outage at site (RII = 0.888). The seven significant factors were used to develop a multiple linear regression (MLR) maintenance management model using a 70/15/15 training, validation, and test split. The model explained 97.8% of the variance in availability performance in the training set, achieved R² = 0.983 on the test set with a mean absolute percentage error below 2.2%, and was significant overall (F = 387.37, p < 0.001). The validated model was embedded in a web-based, role-based CMMS prototype with modules for availability prediction, fault tickets, work orders, assets, preventive and corrective maintenance, inventory, reporting, and user management. All 35 functional test cases passed in a controlled environment. The study concludes that TTCL's availability challenges arise from measurable factors that can be computerised to support proactive, data-driven maintenance, and recommends pilot deployment followed by longitudinal evaluation.

East African Journal of EngineeringVol. 9(2)
Dar es Salaam Institute of Technology (TZ)
Reliability and Maintenance Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon