Funding the Kariba Dam and Powering Central Africa: Finance, Development and Anti-Colonialism, 1950s–1964

Building on critiques of the concept of development, this article focuses on the contesting territorial interests of Southern Rhodesia and Northern Rhodesia over a shared asset: the Kariba Dam. The dam was constructed between 1956 and 1959 as the largest hydropower modernisation project on the African continent at the time. It connects Britain’s nation-building experiment in central Africa with the financial initiatives of the International Bank for Reconstruction and Development and the Colonial Development Corporation in their efforts to rebuild a post-Second World War world through a developmental framework, then demonstrates how the dynamics of historical change complicated this initiative. The article examines the centrality of international politics of finance, tracing these developments through the establishment in 1953, and collapse in 1963, of the Federation of Rhodesia and Nyasaland. The case of the Federation’s construction of the Kariba Dam demonstrates how imperial interests and international finance dramatically altered the region’s geopolitics, raising questions about the motives of those who pushed development projects in particular contexts at specific historical moments.

Authors

Institutions

Publication Details

Journal
Journal of Southern African Studies
Published
2026-11-23
DOI
https://doi.org/10.1080/03057070.2026.2753387
Primary Topic
African studies and sociopolitical issues
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Funding the Kariba Dam and Powering Central Africa: Finance, Development and Anti-Colonialism, 1950s–1964

Tinashe Nyamunda
Journal of Southern African Studies
African studies and sociopolitical issues
article

Funding the Kariba Dam and Powering Central Africa: Finance, Development and Anti-Colonialism, 1950s–1964

Tinashe Nyamunda
article en

Abstract

Building on critiques of the concept of development, this article focuses on the contesting territorial interests of Southern Rhodesia and Northern Rhodesia over a shared asset: the Kariba Dam. The dam was constructed between 1956 and 1959 as the largest hydropower modernisation project on the African continent at the time. It connects Britain’s nation-building experiment in central Africa with the financial initiatives of the International Bank for Reconstruction and Development and the Colonial Development Corporation in their efforts to rebuild a post-Second World War world through a developmental framework, then demonstrates how the dynamics of historical change complicated this initiative. The article examines the centrality of international politics of finance, tracing these developments through the establishment in 1953, and collapse in 1963, of the Federation of Rhodesia and Nyasaland. The case of the Federation’s construction of the Kariba Dam demonstrates how imperial interests and international finance dramatically altered the region’s geopolitics, raising questions about the motives of those who pushed development projects in particular contexts at specific historical moments.

Journal of Southern African Studies
University of Glasgow (GB)
University of Glasgow, Universiteit van die Vrystaat
African studies and sociopolitical issues
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon