Assessment of the Labor-intensity of an Investment and Construction Project

Statement of the problem. At the stage of a feasibility study, it is customary to consider the duration and cost of constructing a capital construction facility as criteria. Due attention is not paid to the amount of labor intensity, although this indicator has a significant impact on both the cost and duration of the construction of a capital construction facility. Results. As a result of the study, the statistical dependence of labor intensity on the area of the capital construction object is substantiated using the example of a residential building made of monolithic reinforced concrete. The obtained dependence provides the calculation of the labor intensity value at the stage of the feasibility study of the construction project and can be used in the preparation of a task for the design of a capital construction facility. Conclusions. The use of statistical dependence of labor intensity on the area of a residential building is important at the stage of substantiating the decision to start financing an investment and construction project. In addition, this dependence can be applied when designing the allocation of resources during the construction of a capital construction facility (drawing up a calendar plan as part of a construction project). The use of statistical dependence of labor intensity on the area of a residential building made of monolithic reinforced concrete ensures high reliability of the calculated values.

Authors

Institutions

Publication Details

Journal
НАУЧНЫЙ ЖУРНАЛ СТРОИТЕЛЬСТВА И АРХИТЕКТУРЫ
Published
2026-11-23
DOI
https://doi.org/10.36622/2542-0526.2026.72.4.009
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Assessment of the Labor-intensity of an Investment and Construction Project

Vadim Nikolaevich Kabanov, E. V. Mikhailova
НАУЧНЫЙ ЖУРНАЛ СТРОИТЕЛЬСТВА И АРХИТЕКТУРЫ
Construction Project Management and Performance
article

Assessment of the Labor-intensity of an Investment and Construction Project

Vadim Nikolaevich Kabanov, E. V. Mikhailova
article en

Abstract

Statement of the problem. At the stage of a feasibility study, it is customary to consider the duration and cost of constructing a capital construction facility as criteria. Due attention is not paid to the amount of labor intensity, although this indicator has a significant impact on both the cost and duration of the construction of a capital construction facility. Results. As a result of the study, the statistical dependence of labor intensity on the area of the capital construction object is substantiated using the example of a residential building made of monolithic reinforced concrete. The obtained dependence provides the calculation of the labor intensity value at the stage of the feasibility study of the construction project and can be used in the preparation of a task for the design of a capital construction facility. Conclusions. The use of statistical dependence of labor intensity on the area of a residential building is important at the stage of substantiating the decision to start financing an investment and construction project. In addition, this dependence can be applied when designing the allocation of resources during the construction of a capital construction facility (drawing up a calendar plan as part of a construction project). The use of statistical dependence of labor intensity on the area of a residential building made of monolithic reinforced concrete ensures high reliability of the calculated values.

НАУЧНЫЙ ЖУРНАЛ СТРОИТЕЛЬСТВА И АРХИТЕКТУРЫ(4(72))
Moscow State University of Civil Engineering (RU)
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon