Optimizing Resource Allocation in a Construction Project Based on Heuristic Algorithms

Statement of the problem. The application of algorithmic methods for solving the problem of stones to optimize the allocation of resources in the construction industry is considered. Results. The classical formulations of the problem of dividing a set of elements into groups with a minimum maximum weight are investigated, their computational complexity and practical applicability are analyzed. Modified algorithms are proposed, including a two-pass greedy algorithm with binary search and a method for reducing to the maximum flow problem in the network. Using the example of the distribution of work volumes between structural divisions of a construction company, the effectiveness of the proposed approaches is demonstrated. Conclusions. It is shown that the combination of heuristic and accurate methods allows us to find solutions close to optimal in conditions of limited resources and tight time frames. The results of the work can be used to develop automated decision support systems in project management.

Authors

Institutions

Publication Details

Journal
НАУЧНЫЙ ЖУРНАЛ СТРОИТЕЛЬСТВА И АРХИТЕКТУРЫ
Published
2026-11-23
DOI
https://doi.org/10.36622/2542-0526.2026.72.4.008
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Optimizing Resource Allocation in a Construction Project Based on Heuristic Algorithms

Курочка Павел Николаевич, С. А. Баркалов
НАУЧНЫЙ ЖУРНАЛ СТРОИТЕЛЬСТВА И АРХИТЕКТУРЫ
Resource-Constrained Project Scheduling
article

Optimizing Resource Allocation in a Construction Project Based on Heuristic Algorithms

Курочка Павел Николаевич, С. А. Баркалов
article en

Abstract

Statement of the problem. The application of algorithmic methods for solving the problem of stones to optimize the allocation of resources in the construction industry is considered. Results. The classical formulations of the problem of dividing a set of elements into groups with a minimum maximum weight are investigated, their computational complexity and practical applicability are analyzed. Modified algorithms are proposed, including a two-pass greedy algorithm with binary search and a method for reducing to the maximum flow problem in the network. Using the example of the distribution of work volumes between structural divisions of a construction company, the effectiveness of the proposed approaches is demonstrated. Conclusions. It is shown that the combination of heuristic and accurate methods allows us to find solutions close to optimal in conditions of limited resources and tight time frames. The results of the work can be used to develop automated decision support systems in project management.

НАУЧНЫЙ ЖУРНАЛ СТРОИТЕЛЬСТВА И АРХИТЕКТУРЫ(4(72))
Voronezh State Technical University (RU)
Resource-Constrained Project Scheduling
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon