Ensemble NSGA-III for Time-Cost-Quality-Safety Optimization in Construction Engineering
This study establishes a four-objective trade-off optimization model that incorporates the time value of money into the cost function, and proposes an ensemble NSGA-III algorithm with dynamic reference points, time-varying mutation rates, random replacement, and elite archive strategies to enhance convergence and robustness. A railway track project comprising 15 construction processes is used as a case study. The proposed algorithm is benchmarked against NSGA-II, MOPSO, MOEA/D, SPEA2, and MOSA using seven metrics across 100 independent simulations. An ablation study isolates the contribution of each mechanism, showing that the elite archive plays a dominant role in long-term convergence, while the ensemble strategy provides the most consistent overall improvement. Results demonstrate that the proposed ENSGA-III achieves the best average rank of 1.86 across the seven metrics, indicating the most balanced and competitive performance compared to other algorithms.
Authors
- Yan Zhang (ORCID: https://orcid.org/0000-0002-8561-5092)
- Linya Liu (ORCID: https://orcid.org/0009-0006-4368-6403)
- Wei-Cheng Hu
Institutions
- East China Jiaotong University (CN)
- North China University of Water Resources and Electric Power (CN)
Publication Details
- Journal
- Canadian Journal of Civil Engineering
- Published
- 2026-11-23
- DOI
- https://doi.org/10.1139/cjce-2026-0501
- Primary Topic
- Resource-Constrained Project Scheduling
- Type
- article
- Field-Weighted Citation Impact
- 0.00