Ensemble NSGA-III for Time-Cost-Quality-Safety Optimization in Construction Engineering

This study establishes a four-objective trade-off optimization model that incorporates the time value of money into the cost function, and proposes an ensemble NSGA-III algorithm with dynamic reference points, time-varying mutation rates, random replacement, and elite archive strategies to enhance convergence and robustness. A railway track project comprising 15 construction processes is used as a case study. The proposed algorithm is benchmarked against NSGA-II, MOPSO, MOEA/D, SPEA2, and MOSA using seven metrics across 100 independent simulations. An ablation study isolates the contribution of each mechanism, showing that the elite archive plays a dominant role in long-term convergence, while the ensemble strategy provides the most consistent overall improvement. Results demonstrate that the proposed ENSGA-III achieves the best average rank of 1.86 across the seven metrics, indicating the most balanced and competitive performance compared to other algorithms.

Authors

Institutions

Publication Details

Journal
Canadian Journal of Civil Engineering
Published
2026-11-23
DOI
https://doi.org/10.1139/cjce-2026-0501
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Ensemble NSGA-III for Time-Cost-Quality-Safety Optimization in Construction Engineering

Yan Zhang, Linya Liu, Wei-Cheng Hu
Canadian Journal of Civil Engineering
Resource-Constrained Project Scheduling
article

Ensemble NSGA-III for Time-Cost-Quality-Safety Optimization in Construction Engineering

Yan Zhang, Linya Liu, Wei-Cheng Hu
article en

Abstract

This study establishes a four-objective trade-off optimization model that incorporates the time value of money into the cost function, and proposes an ensemble NSGA-III algorithm with dynamic reference points, time-varying mutation rates, random replacement, and elite archive strategies to enhance convergence and robustness. A railway track project comprising 15 construction processes is used as a case study. The proposed algorithm is benchmarked against NSGA-II, MOPSO, MOEA/D, SPEA2, and MOSA using seven metrics across 100 independent simulations. An ablation study isolates the contribution of each mechanism, showing that the elite archive plays a dominant role in long-term convergence, while the ensemble strategy provides the most consistent overall improvement. Results demonstrate that the proposed ENSGA-III achieves the best average rank of 1.86 across the seven metrics, indicating the most balanced and competitive performance compared to other algorithms.

Canadian Journal of Civil Engineering
East China Jiaotong University (CN), North China University of Water Resources and Electric Power (CN)
Resource-Constrained Project Scheduling
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
Ensemble NSGA-III for Time-Cost-Quality-Safety Optimization in Construction Engineering — Yan Zhang, Linya Liu, et al. · Canadian Journal of Civil Engineering (2026) | TGRS Research Map | TGRS