Distributionally Robust Outsourcing for Parallel-Machine Scheduling Under Resource Asymmetry and Wasserstein Ambiguity
Uncertain processing times complicate the allocation of production batches between internal machines and external manufacturers. Motivated by a display manufacturer in China, this study develops a Wasserstein distributionally robust model that jointly determines which batches to outsource and how to schedule the remaining batches on parallel machines. The model minimizes effective outsourcing costs and worst-case expected completion-time costs while limiting each machine’s overload probability and bounding the expected total outsourced workload. We derive an equivalent mixed-integer linear reformulation and develop a branch-and-Benders-cut algorithm. In the computational experiments, the proposed model yielded lower reported overload risk than deterministic optimization and sample-average approximation. In a separate out-of-sample evaluation, it reduced average cost by 6.08% relative to SAA and 13.35% relative to deterministic optimization. The algorithm also returned solutions sooner than the compact formulation on several larger instances. In the factory application, the average reported outsourcing-partner satisfaction rate was 94.74% over the observation period. These findings illustrate how the model can help manufacturers balance internal capacity protection with external workload requirements.
Authors
- Zhipeng Su (ORCID: https://orcid.org/0000-0003-0995-7469)
- Zhenjie Zou
- Meiying Wu (ORCID: https://orcid.org/0009-0006-7073-3965)
- Wenwen Han
Institutions
- Fujian Jiangxia University (CN)
- Fuzhou University (CN)
Publication Details
- Journal
- Symmetry
- Published
- 2026-11-23
- DOI
- https://doi.org/10.3390/sym18121961
- Primary Topic
- Scheduling and Optimization Algorithms
- Type
- article
- Field-Weighted Citation Impact
- 0.00