GTOpt: Open-Source Energy-System Optimization, Consistent from Minutes to Decades

Planning and operating energy systems with high shares of variable renewables, storage and hydro requires models that remain consistent from daily dispatch to multi-decade expansion. This paper presents GTOpt, an open-source optimizer written in C++26 for the expansion planning of generation, transmission, storage and demand, hydrothermal scheduling, and unit commitment and dispatch. The same formulation is used at every time scale, from 15-minute blocks to 30-year horizons. It covers DC power flow with Kirchhoff constraints and line losses, hydro cascades with water rights, batteries, unit commitment, reserves and inertia, multi-carrier chains (fuels, LNG, hydrogen, ammonia, heat) and multi-pollutant emission zones with caps and allowance banking. The time scales are coupled through optimality cuts, which carry water values and storage opportunity costs, and through feasibility cuts, which enforce reservoir and water-right limits. Three methods are provided: a monolithic LP/MIP; stochastic dual dynamic programming (SDDP) with backward-pass apertures, multi-cut and elastic-filterfeasibility cuts; and a multi-level cascade that refines a coarse model into a detailed one while inheriting its cuts. Operating rules such as the Chilean irrigation agreements are added without code through PAMPL, an AMPL-like constraint language, and LP/MIP solvers are loaded at run time as plugins. GTOpt is validated against IEEE benchmark networks, pandapower and published SDDP benchmarks. It is also compared with the official daily schedule of the Chilean national system on 14 days, using the system operator’s PLEXOS inputs and results. The comparison shows that the line-loss model drives most of the differences: a piecewise-linear loss model with free losses inflates them to 2.5 times their physical value, whereas a tangent outer approximation with a small loss price stays within 5%.

Authors

Publication Details

Journal
Engineering Archive (engrXiv)
Published
2026-11-23
DOI
https://doi.org/10.31224/8872
Primary Topic
Electric Power System Optimization
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
preprint

GTOpt: Open-Source Energy-System Optimization, Consistent from Minutes to Decades

Marcos Falcone, María del Pilar Buitrago-Villada, Marcelo Matus, Gonzalo Bustos et al.
Engineering Archive (engrXiv)
Electric Power System Optimization
preprint

GTOpt: Open-Source Energy-System Optimization, Consistent from Minutes to Decades

Marcos Falcone, María del Pilar Buitrago-Villada, Marcelo Matus, Gonzalo Bustos, Catalina Lopez, Erick Sierra, Carlos García
preprint en

Abstract

Planning and operating energy systems with high shares of variable renewables, storage and hydro requires models that remain consistent from daily dispatch to multi-decade expansion. This paper presents GTOpt, an open-source optimizer written in C++26 for the expansion planning of generation, transmission, storage and demand, hydrothermal scheduling, and unit commitment and dispatch. The same formulation is used at every time scale, from 15-minute blocks to 30-year horizons. It covers DC power flow with Kirchhoff constraints and line losses, hydro cascades with water rights, batteries, unit commitment, reserves and inertia, multi-carrier chains (fuels, LNG, hydrogen, ammonia, heat) and multi-pollutant emission zones with caps and allowance banking. The time scales are coupled through optimality cuts, which carry water values and storage opportunity costs, and through feasibility cuts, which enforce reservoir and water-right limits. Three methods are provided: a monolithic LP/MIP; stochastic dual dynamic programming (SDDP) with backward-pass apertures, multi-cut and elastic-filterfeasibility cuts; and a multi-level cascade that refines a coarse model into a detailed one while inheriting its cuts. Operating rules such as the Chilean irrigation agreements are added without code through PAMPL, an AMPL-like constraint language, and LP/MIP solvers are loaded at run time as plugins. GTOpt is validated against IEEE benchmark networks, pandapower and published SDDP benchmarks. It is also compared with the official daily schedule of the Chilean national system on 14 days, using the system operator’s PLEXOS inputs and results. The comparison shows that the line-loss model drives most of the differences: a piecewise-linear loss model with free losses inflates them to 2.5 times their physical value, whereas a tangent outer approximation with a small loss price stays within 5%.

Engineering Archive (engrXiv)
Electric Power System Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon