Assessing Contractor Site Supervision for Construction Delay Mitigation: Delay Factors, Implementation Barriers and Improvement Strategies in Kuala Lumpur, Malaysia
Effective contractor site supervision requires both professional competence and organizational support, yet these dimensions are often examined separately in construction-delay research. This study investigates perceived supervision-related delay factors, barriers to implementing supervisory responsibilities under Pertubuhan Akitek Malaysia (Malaysian Institute of Architects (PAM) Contract 2018, and management improvement priorities in Kuala Lumpur building projects. A quantitative, cross-sectional questionnaire survey yielded 113 contractor-affiliated responses through targeted, non-probability recruitment. Data were analyzed using descriptive statistics and the Relative Importance Index (RII). Inadequate daily monitoring ranked highest among supervisory delay factors (RII = 0.896), followed by poor subcontractor coordination (0.804). Limited decision-making authority (0.867) and insufficient manpower or resources (0.830) were the leading implementation barriers. Digital tools (0.858) and routine monitoring and reporting (0.851) received the highest improvement-strategy rankings. The findings suggest that supervisory development should combine task-specific training with clearer delegation, adequate resources and actionable reporting. The study contributes a management-oriented interpretation linking supervisory responsibilities with organizational implementation conditions. Non-probability recruitment, the predominance of quantity surveyors and reliance on perceptions limit generalizability and prevent causal conclusions.
Authors
- Zetty Pakir Mastan (ORCID: https://orcid.org/0009-0003-2395-7120)
- Kok Ching Wen
- Wilgene Chung
- Nga Elsie
- Samad Mohammad Ebrahimzade Sepasgozar
Institutions
- INTI International University (MY)
- UNSW Sydney (AU)
Publication Details
- Journal
- International Journal of Management Thinking
- Published
- 2026-11-22
- DOI
- https://doi.org/10.56868/ijmt.v4i2.121
- Primary Topic
- Construction Project Management and Performance
- Type
- article
- Field-Weighted Citation Impact
- 0.00