Assessing Contractor Site Supervision for Construction Delay Mitigation: Delay Factors, Implementation Barriers and Improvement Strategies in Kuala Lumpur, Malaysia

Effective contractor site supervision requires both professional competence and organizational support, yet these dimensions are often examined separately in construction-delay research. This study investigates perceived supervision-related delay factors, barriers to implementing supervisory responsibilities under Pertubuhan Akitek Malaysia (Malaysian Institute of Architects (PAM) Contract 2018, and management improvement priorities in Kuala Lumpur building projects. A quantitative, cross-sectional questionnaire survey yielded 113 contractor-affiliated responses through targeted, non-probability recruitment. Data were analyzed using descriptive statistics and the Relative Importance Index (RII). Inadequate daily monitoring ranked highest among supervisory delay factors (RII = 0.896), followed by poor subcontractor coordination (0.804). Limited decision-making authority (0.867) and insufficient manpower or resources (0.830) were the leading implementation barriers. Digital tools (0.858) and routine monitoring and reporting (0.851) received the highest improvement-strategy rankings. The findings suggest that supervisory development should combine task-specific training with clearer delegation, adequate resources and actionable reporting. The study contributes a management-oriented interpretation linking supervisory responsibilities with organizational implementation conditions. Non-probability recruitment, the predominance of quantity surveyors and reliance on perceptions limit generalizability and prevent causal conclusions.

Authors

Institutions

Publication Details

Journal
International Journal of Management Thinking
Published
2026-11-22
DOI
https://doi.org/10.56868/ijmt.v4i2.121
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Assessing Contractor Site Supervision for Construction Delay Mitigation: Delay Factors, Implementation Barriers and Improvement Strategies in Kuala Lumpur, Malaysia

Zetty Pakir Mastan, Kok Ching Wen, Wilgene Chung, Nga Elsie et al.
International Journal of Management Thinking
Construction Project Management and Performance
article

Assessing Contractor Site Supervision for Construction Delay Mitigation: Delay Factors, Implementation Barriers and Improvement Strategies in Kuala Lumpur, Malaysia

Zetty Pakir Mastan, Kok Ching Wen, Wilgene Chung, Nga Elsie, Samad Mohammad Ebrahimzade Sepasgozar
article en

Abstract

Effective contractor site supervision requires both professional competence and organizational support, yet these dimensions are often examined separately in construction-delay research. This study investigates perceived supervision-related delay factors, barriers to implementing supervisory responsibilities under Pertubuhan Akitek Malaysia (Malaysian Institute of Architects (PAM) Contract 2018, and management improvement priorities in Kuala Lumpur building projects. A quantitative, cross-sectional questionnaire survey yielded 113 contractor-affiliated responses through targeted, non-probability recruitment. Data were analyzed using descriptive statistics and the Relative Importance Index (RII). Inadequate daily monitoring ranked highest among supervisory delay factors (RII = 0.896), followed by poor subcontractor coordination (0.804). Limited decision-making authority (0.867) and insufficient manpower or resources (0.830) were the leading implementation barriers. Digital tools (0.858) and routine monitoring and reporting (0.851) received the highest improvement-strategy rankings. The findings suggest that supervisory development should combine task-specific training with clearer delegation, adequate resources and actionable reporting. The study contributes a management-oriented interpretation linking supervisory responsibilities with organizational implementation conditions. Non-probability recruitment, the predominance of quantity surveyors and reliance on perceptions limit generalizability and prevent causal conclusions.

International Journal of Management ThinkingVol. 4(2)
INTI International University (MY), UNSW Sydney (AU)
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
Assessing Contractor Site Supervision for Construction Delay Mitigation: Delay Factors, Implementation Barriers and Improvement Strategies in Kuala Lumpur, Malaysia — Zetty Pakir Mastan, Kok Ching Wen, et al. · International Journal of Management Thinking (2026) | TGRS Research Map | TGRS