Irreversible Machinery Investment and Exact Deadline Optimality in Closed Batch Production

In a closed production batch, investing in self-synthesizing machinery accelerates conversion while retaining material that could become product. For an established substrate-depletion allocation model, we give primitive rate conditions under which zero ribosomal investment uniquely maximizes terminal product at every sufficiently late finite deadline, over all measurable allocations from a fixed complete initial state. The result allows finite-order processing degeneration and algebraic depletion. A reachable-state cone, a material-budget adjoint bound and a relative processing estimate establish the strict global verification inequality. In one fixed double-Hill instance, zero investment is uniquely optimal at all sufficiently short deadlines, a validated investment pulse improves product by more than 0.0045 throughout [29.8, 30.4], and zero investment is again uniquely optimal at every deadline at least 50,021,000. Its optimal-deadline set is therefore neither upward nor downward closed. A processing cutoff destroys eventual uniqueness, and terminal needle variations rule out a uniform positive loss per unit of unweighted investment, even at deadlines with a unique optimum. The result provides an exact global benchmark for an existing batch-production problem. The PDF contains the complete article and Supplements S1–S4 in English, followed by the complete Simplified Chinese version. The accompanying archive contains the replication code, numerical enclosures and exact checks. No experimental data are reported. 在封闭生产批次中,投资于能够自我合成的机器会加快物质转化,同时把原可转化为产物的一部分物质留在机器中。针对既有的底物耗竭分配模型,本文给出直接作用于速率函数的条件。在这些条件下,从固定的完整初始状态出发,在所有可测分配中,零核糖体投资在每一个足够晚的有限期限上唯一地最大化终端产物。定理允许有限阶加工退化和代数速率耗竭。可达状态锥、物质预算给出的伴随估计和相对加工速率界共同建立了严格的全局验证不等式。在一个固定的双 Hill 实例中,零投资在所有足够短的期限上唯一最优。一个经过验证的投资脉冲在整个 [29.8, 30.4] 区间内使产物增量大于 0.0045。对每个不小于 50,021,000 的期限,零投资再次唯一最优。因此,零投资的最优期限集合既非向上封闭,也非向下封闭。加工停机使最终唯一性失效。即使某一期限上的最优策略唯一,终端针状变分仍排除了未加权投资每单位损失的一致正下界。这些结果为既有的批次生产问题提供了精确的全局基准。 PDF 将英文正文及补充材料 S1–S4 放在前半部,随后是完整简体中文版。配套归档包含复算代码、数值区间包络和精确检查。本文无实验数据。

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-22
DOI
https://doi.org/10.5281/zenodo.24442632
Primary Topic
Microbial Metabolic Engineering and Bioproduction
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
preprint

Irreversible Machinery Investment and Exact Deadline Optimality in Closed Batch Production

Man Huang
Zenodo (CERN European Organization for Nuclear Research)
Microbial Metabolic Engineering and Bioproduction
preprint

Irreversible Machinery Investment and Exact Deadline Optimality in Closed Batch Production

Man Huang
preprint en

Abstract

In a closed production batch, investing in self-synthesizing machinery accelerates conversion while retaining material that could become product. For an established substrate-depletion allocation model, we give primitive rate conditions under which zero ribosomal investment uniquely maximizes terminal product at every sufficiently late finite deadline, over all measurable allocations from a fixed complete initial state. The result allows finite-order processing degeneration and algebraic depletion. A reachable-state cone, a material-budget adjoint bound and a relative processing estimate establish the strict global verification inequality. In one fixed double-Hill instance, zero investment is uniquely optimal at all sufficiently short deadlines, a validated investment pulse improves product by more than 0.0045 throughout [29.8, 30.4], and zero investment is again uniquely optimal at every deadline at least 50,021,000. Its optimal-deadline set is therefore neither upward nor downward closed. A processing cutoff destroys eventual uniqueness, and terminal needle variations rule out a uniform positive loss per unit of unweighted investment, even at deadlines with a unique optimum. The result provides an exact global benchmark for an existing batch-production problem. The PDF contains the complete article and Supplements S1–S4 in English, followed by the complete Simplified Chinese version. The accompanying archive contains the replication code, numerical enclosures and exact checks. No experimental data are reported. 在封闭生产批次中,投资于能够自我合成的机器会加快物质转化,同时把原可转化为产物的一部分物质留在机器中。针对既有的底物耗竭分配模型,本文给出直接作用于速率函数的条件。在这些条件下,从固定的完整初始状态出发,在所有可测分配中,零核糖体投资在每一个足够晚的有限期限上唯一地最大化终端产物。定理允许有限阶加工退化和代数速率耗竭。可达状态锥、物质预算给出的伴随估计和相对加工速率界共同建立了严格的全局验证不等式。在一个固定的双 Hill 实例中,零投资在所有足够短的期限上唯一最优。一个经过验证的投资脉冲在整个 [29.8, 30.4] 区间内使产物增量大于 0.0045。对每个不小于 50,021,000 的期限,零投资再次唯一最优。因此,零投资的最优期限集合既非向上封闭,也非向下封闭。加工停机使最终唯一性失效。即使某一期限上的最优策略唯一,终端针状变分仍排除了未加权投资每单位损失的一致正下界。这些结果为既有的批次生产问题提供了精确的全局基准。 PDF 将英文正文及补充材料 S1–S4 放在前半部,随后是完整简体中文版。配套归档包含复算代码、数值区间包络和精确检查。本文无实验数据。

Zenodo (CERN European Organization for Nuclear Research)
Microbial Metabolic Engineering and Bioproduction
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon