OTIMIZAÇÃO DA GESTÃO DA MANUTENÇÃO DE ELEVADOR DE CANECA PARA MOVIMENTAÇÃO DE FARELO EM MOINHO DE TRIGO

Maintenance management plays a strategic role in the continuity of industrial processes, especially for equipment whose unavailability may compromise production stages. This study analyzes the maintenance management of a bucket elevator used for bran handling in a wheat mill located in the Baixada Santista region. The research is characterized as a qualitative case study and uses work order records, failure analysis, Ishikawa Diagram, Criticality Matrix, Lean Manufacturing principles and performance indicators. The results indicated 93.33% availability, MTBF of 4,380 hours, MTTR of 4 hours and 20 minutes, and 91.67% compliance with preventive maintenance, in addition to the equipment being classified as Criticality A.

Authors

Institutions

Publication Details

Journal
Anais do Congresso Brasileiro de Iniciação Científica
Published
2026-11-22
DOI
https://doi.org/10.66221/nq696331
Primary Topic
Reliability and Maintenance Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

OTIMIZAÇÃO DA GESTÃO DA MANUTENÇÃO DE ELEVADOR DE CANECA PARA MOVIMENTAÇÃO DE FARELO EM MOINHO DE TRIGO

Isabella Bueno, Bruna Paulino, Pedro Da Silva, Rafael Antunes et al.
Anais do Congresso Brasileiro de Iniciação Científica
Reliability and Maintenance Optimization
article

OTIMIZAÇÃO DA GESTÃO DA MANUTENÇÃO DE ELEVADOR DE CANECA PARA MOVIMENTAÇÃO DE FARELO EM MOINHO DE TRIGO

Isabella Bueno, Bruna Paulino, Pedro Da Silva, Rafael Antunes, Carlos Moino
article en

Abstract

Maintenance management plays a strategic role in the continuity of industrial processes, especially for equipment whose unavailability may compromise production stages. This study analyzes the maintenance management of a bucket elevator used for bran handling in a wheat mill located in the Baixada Santista region. The research is characterized as a qualitative case study and uses work order records, failure analysis, Ishikawa Diagram, Criticality Matrix, Lean Manufacturing principles and performance indicators. The results indicated 93.33% availability, MTBF of 4,380 hours, MTTR of 4 hours and 20 minutes, and 91.67% compliance with preventive maintenance, in addition to the equipment being classified as Criticality A.

Anais do Congresso Brasileiro de Iniciação CientíficaVol. 3(1)
Universidade Santa Cecília (BR)
Reliability and Maintenance Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon