Integrating 4D Construction Modelling with Project Controls: A Framework for Digital Project Planning and Progress Measurement in Saudi Construction Projects for Vision 2030 Delivery
Four-dimensional (4D) construction models, which link a three-dimensional building model to the construction schedule, are now common on large projects, yet on most of them the 4D model and the project controls system run as separate workflows. The 4D model is used to show the planned sequence, while progress and earned value are still measured from site estimates entered into spreadsheets. As a result, progress is measured twice, or the model plays no part in measurement at all. This paper proposes a framework that makes the 4D model the basis of project controls. The framework has five stages (plan, link, measure, analyse and act), a data structure that connects each model element to an activity, a work package and a control account, and a set of calculations that turn element status into percent complete and earned value. The framework is demonstrated through an illustrative case study of a hypothetical four-storey building with a budget of SAR 40 million. In that example, the model-based measurement gives a schedule performance index of 0.86 against 0.98 from conventional reported estimates, showing how subjective progress estimates can hide slippage. The paper also proposes a five-level maturity model and a responsibility matrix for adoption in Saudi Arabia, where BIM has been required for major projects since January 2024. The case data are hypothetical and the framework remains to be tested on live projects.
Authors
- Ahmed Babu Shahas VP
Publication Details
- Journal
- International Journal of Research & Technology
- Published
- 2026-11-20
- DOI
- https://doi.org/10.64882/ijrt.v14.i4.2076
- Primary Topic
- BIM and Construction Integration
- Type
- article
- Field-Weighted Citation Impact
- 0.00