FACTOR ANALYSIS OF FACTORS AFFECTING COST PERFORMANCE OF ASPHALT ROAD CONSTRUCTION PROJECTS IN SOUTH-EAST, NIGERIA

Cost is one of the most crucial measures of project success. Improving cost performance of asphalt road construction projects, still remains one of the challenges facing the construction industry in developing countries and in south-east, Nigeria. The aim of this research was to factorize the factors affecting cost performance of asphalt roads in some states, in South-East, Nigeria in order to enhance cost performance of road construction projects. While the objectives were to determine the factors that affect cost performance of asphalt road construction projects in South-East Nigeria. The design adopted for the study was Descriptive survey research, where extensive related literature and secondary data collection related to cost performance were explored. 389 respondents were sampled and administered copies of questionnaires on factors that affect cost performance of road construction projects and the measures to mitigate cost overrun in asphalt road construction projects. The data collected were analyzed using factor analysis and Anova. It was observed that factors affecting cost performance of asphalt road construction projects were peculiar to each state with some similarities. This was achieved by determining the Kaiser-Meyer-Olkin (KMO) of sample adequacy and Bartlett’s test for sphericity. The result also reveals that the accepted measures to mitigate cost overrun in road construction projects were ensured to complete projects within specified time, use of project management metrics, engagement of quantity surveyor, regular organisation of financial meetings, accurate project estimations. It is recommended that Initial cost should always be used to check if the project has performed even before the completion of the project. Moreover, the revealed mitigating measures for cost overrun should be strictly adhered by construction professional to improve cost performance of asphalt road construction project.

Authors

Institutions

Publication Details

Journal
International Journal of African Development and Sustainable Research
Published
2026-11-21
DOI
https://doi.org/10.70382/nijadsr.v14i2.067
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

FACTOR ANALYSIS OF FACTORS AFFECTING COST PERFORMANCE OF ASPHALT ROAD CONSTRUCTION PROJECTS IN SOUTH-EAST, NIGERIA

FRANCIS JOSEPH FRANCIS, FRANCISCA OKEKE
International Journal of African Development and Sustainable Research
Construction Project Management and Performance
article

FACTOR ANALYSIS OF FACTORS AFFECTING COST PERFORMANCE OF ASPHALT ROAD CONSTRUCTION PROJECTS IN SOUTH-EAST, NIGERIA

FRANCIS JOSEPH FRANCIS, FRANCISCA OKEKE
article en

Abstract

Cost is one of the most crucial measures of project success. Improving cost performance of asphalt road construction projects, still remains one of the challenges facing the construction industry in developing countries and in south-east, Nigeria. The aim of this research was to factorize the factors affecting cost performance of asphalt roads in some states, in South-East, Nigeria in order to enhance cost performance of road construction projects. While the objectives were to determine the factors that affect cost performance of asphalt road construction projects in South-East Nigeria. The design adopted for the study was Descriptive survey research, where extensive related literature and secondary data collection related to cost performance were explored. 389 respondents were sampled and administered copies of questionnaires on factors that affect cost performance of road construction projects and the measures to mitigate cost overrun in asphalt road construction projects. The data collected were analyzed using factor analysis and Anova. It was observed that factors affecting cost performance of asphalt road construction projects were peculiar to each state with some similarities. This was achieved by determining the Kaiser-Meyer-Olkin (KMO) of sample adequacy and Bartlett’s test for sphericity. The result also reveals that the accepted measures to mitigate cost overrun in road construction projects were ensured to complete projects within specified time, use of project management metrics, engagement of quantity surveyor, regular organisation of financial meetings, accurate project estimations. It is recommended that Initial cost should always be used to check if the project has performed even before the completion of the project. Moreover, the revealed mitigating measures for cost overrun should be strictly adhered by construction professional to improve cost performance of asphalt road construction project.

International Journal of African Development and Sustainable Research
Enugu State University of Science and Technology (NG)
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
FACTOR ANALYSIS OF FACTORS AFFECTING COST PERFORMANCE OF ASPHALT ROAD CONSTRUCTION PROJECTS IN SOUTH-EAST, NIGERIA — FRANCIS JOSEPH FRANCIS, FRANCISCA OKEKE · International Journal of African Development and Sustainable Research (2026) | TGRS Research Map | TGRS