AN INTEGRATED STRATEGIC MANAGEMENT MODEL FOR TRANSPORT INFRASTRUCTURE DELIVERY IN GHANA: A PROPOSED SYNTHESIS OF PROJECT, PORTFOLIO AND ORGANISATIONAL APPROACHES
Purpose: This article proposes an integrated strategic management model for Ghanaian transport infrastructure projects by combining project-level control, portfolio prioritisation and organisational alignment. Design/methodology: A pragmatist mixed-methods study drew on questionnaires administered to infrastructure administrators, consultants and contractors and interviews with users. A previously reported six-predictor regression informed component selection, and qualitative perspectives and literature guided model specification. Findings: The source reports R² = .764 and positive unstandardised coefficients for the Project Management Life Cycle (B = .486), Project Portfolio Management (.396) and Higgins 8S Model (.125), selected as the model’s three components. However, inconsistencies in the underlying regression and ANOVA tables prevent independent confirmation of statistical significance or a definitive ranking by effect size. The proposed model specifies communication, flexibility and integration as enabling conditions, alongside policy guidance, training, role assignment, life-cycle implementation and monitoring, evaluation and learning. Originality/value: The model provides an implementation architecture rather than evidence that integrated application improves project outcomes. Implications: Expert review, field pilots and independently measured cost, schedule and quality outcomes are required before any effectiveness claims or sector-wide rollout.
Authors
- Samuel Yaw Banini
- Gideon C Mwanza
- Michael Martinson Boakye
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2026-11-21
- DOI
- https://doi.org/10.5281/zenodo.24415106
- Primary Topic
- Construction Project Management and Performance
- Type
- article
- Field-Weighted Citation Impact
- 0.00