Stage-specific carbon, thermal and cost analysis of reinforced-concrete wet-wall and high-insulation steel-stud drywall systems
The construction industry requires wall systems that reduce construction- and operation-stage impacts, yet studies often compare wet and dry systems with unequal thermal properties or examine thermal bridges without integrating energy, carbon, and cost. This study applied a stage-specific carbon, thermal, and cost comparison to a reinforced-concrete (RC) wet wall, conventional C-stud drywall, and proposed high-insulation slotted steel-stud drywall using TRISCO (Physibel, Ghent, Belgium), TRNSYS 18, life-cycle inventory data, and 60-year present-value sensitivity. For the evaluated opaque non-load-bearing walls, the proposed system had reported emissions of 225.9 kg CO 2 -eq/m2 from material production through on-site construction, 49.5% below the selected RC wall and a reported 4.1% below conventional drywall (percentage reconciliation is discussed in Section 4.3); on-site construction emissions decreased from 36.0 to 18.0 kg CO 2 -eq/m2. At an equal U-value of 0.170 W/(m2·K), its 240 mm thickness was 38.9% below the 392.5 mm RC wall and 14.3% below the 280 mm conventional drywall. Reported annual heating-and-cooling energy consumption was 72.63 kWh/(m2·yr), 11.1% below the RC operational reference and 8.9% below conventional drywall. Operational emissions calculated using simulation-derived energy use and emission factors provided by the Ministry of Environment, Republic of Korea, on a 2021 CO 2 -equivalent basis, were reported as 13.5 kg CO 2 -eq/(m2·yr), compared with 29.5 for RC and 16.6 for conventional drywall. Across real discount rates of 0–5% under constant 2023 real prices, the proposed system’s scenario-based 60-year present-value cost was 13.3–13.7% below the RC wall. Wet-to-dry substitution was the primary upfront-carbon measure; stud optimization provided a smaller additional improvement. The assessment covers climate change only. Operational normalization and energy-to-carbon/cost links remain unverified; maintenance and replacement are excluded from the cost scenario. Conclusions remain configuration-specific and do not establish a reconciled whole-life benefit or structural-safety certification.
Authors
- Kwonye Kim (ORCID: https://orcid.org/0009-0006-6565-0487)
- Yujin Nam (ORCID: https://orcid.org/0000-0003-4627-1634)
- Jae‐Weon Jeong (ORCID: https://orcid.org/0000-0002-5391-3298)
- Youngsik Kwon (ORCID: https://orcid.org/0000-0001-8497-2250)
- Youngdong Yu (ORCID: https://orcid.org/0009-0005-1883-2870)
Institutions
- Pohang Iron and Steel (South Korea) (KR)
- Hanyang University (KR)
- Pusan National University (KR)
Publication Details
- Journal
- Sustainable Energy Technologies and Assessments
- Published
- 2026-11-21
- DOI
- https://doi.org/10.1016/j.seta.2026.105600
- Primary Topic
- Environmental Impact and Sustainability
- Type
- article
- Field-Weighted Citation Impact
- 0.00