Financing the U.S. Electricity Grid Expansion: Investment Barriers and Innovative Capital Structures
The United States needs substantially more transmission capacity than it has built in recent decades, yet financing that expansion is harder than financing most generation assets. Transmission projects have long construction periods, costs shared among many beneficiaries, and revenues set by regulators or contract rather than by market prices. This paper examines the investment barriers that constrain transmission and grid-related capital formation in the United States and assesses the capital structures proposed or adopted to address them. It classifies five barrier categories (cost-recovery lag, merchant revenue risk, interconnection timing, construction risk, and cross-jurisdictional allocation) and evaluates four classes of capital structure against the federal record and recent projects. An illustrative calculation shows that a two-percentage-point increase in the interest rate on a 1-billion-dollar, 30-year loan raises annual debt service by about 15.5 million dollars. The analysis finds that the binding constraints are institutional as much as financial. The termination of the conditional federal financing commitment for the Grain Belt Express project in July 2025 illustrates how reversible federal support can be. Durable grid finance therefore depends on aligning cost recovery, risk allocation, and federal commitments with the multi-decade life of grid assets.
Authors
- Experience Efeosa Akhigbe
Publication Details
- Journal
- International Journal of Humanities and Information Technology
- Published
- 2026-11-20
- DOI
- https://doi.org/10.21590/ijhit.08.04.05
- Primary Topic
- Electric Power System Optimization
- Type
- article
- Field-Weighted Citation Impact
- 0.00