Sloanea's FLNG Choice: PFLNG DUA reuse, alternatives, project economics, the Malaysian–Surinamese legal comparison and what the FID must contain for a viable Gas-to-Shore

Screening note, Revision 1.0 (20 November 2026). Could PETRONAS move its PFLNG DUA floating LNG unit from the Rotan field offshore Sabah to the Sloanea gas field in Block 52 offshore Suriname? This note screens the public evidence: a JGC engineer's public profile listing a DUA relocation FEED from May 2026, Energy Intelligence reporting that favoured PFLNG SATU, and a Wison newbuild FLNG study for Block 52. It finds DUA a credible hypothesis, not an announced decision. Sloanea lies at about 450 m, outside the published turret design envelopes of both DUA (500–1,500 m) and SATU (70–200 m), so either reuse case needs a new mooring and riser solution. The note compares DUA reuse, SATU reuse and a newbuild; shows that Rotan has not been publicly shown to be depleted; gives a transparent gross-revenue and feed-gas screening case (1.35 MTPA, about 230–270 MMscf/d, 1.7–2.0 Tcf over 20 years, GLIAG calculations); and compares Malaysian and Surinamese law, including the Petroleum Development Act 1974, the Gas Supply Act 1993 and the Sarawak Distribution of Gas Ordinance with PETROS as domestic aggregator. The Staatsolie model PSC's domestic supply obligation covers crude oil only, so the Block 52 gas addendum carries any domestic gas obligation. A new Section 8 sets out twelve elements the Sloanea FID package should contain to keep a Gas-to-Shore option viable: a gas balance with a domestic tranche, physical tie-in provisions, sales-gas specification, metering, pipeline corridor and landing point, phasing with SAC-1, a domestic gas obligation, pricing formula, aggregator and credit support, priority rules, FLNG continuity and fiscal and disclosure terms. GLIAG's Gas-to-Shore Pre-Feasibility Study is a GLIAG proposal, not an approved project. Companion works: 10.5281/zenodo.24189783 (The Onshore Dividend). Web edition: petroleumenergyinsights.com.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-20
DOI
https://doi.org/10.5281/zenodo.24407619
Citations
1
Primary Topic
Offshore Engineering and Technologies
Type
article
Field-Weighted Citation Impact
1.39
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Sloanea's FLNG Choice: PFLNG DUA reuse, alternatives, project economics, the Malaysian–Surinamese legal comparison and what the FID must contain for a viable Gas-to-Shore

Marcel P.T. Chin-A-Lien
1 citations
Zenodo (CERN European Organization for Nuclear Research)
Offshore Engineering and Technologies
1.39
article

Sloanea's FLNG Choice: PFLNG DUA reuse, alternatives, project economics, the Malaysian–Surinamese legal comparison and what the FID must contain for a viable Gas-to-Shore

Marcel P.T. Chin-A-Lien
article en
1 citations

Abstract

Screening note, Revision 1.0 (20 November 2026). Could PETRONAS move its PFLNG DUA floating LNG unit from the Rotan field offshore Sabah to the Sloanea gas field in Block 52 offshore Suriname? This note screens the public evidence: a JGC engineer's public profile listing a DUA relocation FEED from May 2026, Energy Intelligence reporting that favoured PFLNG SATU, and a Wison newbuild FLNG study for Block 52. It finds DUA a credible hypothesis, not an announced decision. Sloanea lies at about 450 m, outside the published turret design envelopes of both DUA (500–1,500 m) and SATU (70–200 m), so either reuse case needs a new mooring and riser solution. The note compares DUA reuse, SATU reuse and a newbuild; shows that Rotan has not been publicly shown to be depleted; gives a transparent gross-revenue and feed-gas screening case (1.35 MTPA, about 230–270 MMscf/d, 1.7–2.0 Tcf over 20 years, GLIAG calculations); and compares Malaysian and Surinamese law, including the Petroleum Development Act 1974, the Gas Supply Act 1993 and the Sarawak Distribution of Gas Ordinance with PETROS as domestic aggregator. The Staatsolie model PSC's domestic supply obligation covers crude oil only, so the Block 52 gas addendum carries any domestic gas obligation. A new Section 8 sets out twelve elements the Sloanea FID package should contain to keep a Gas-to-Shore option viable: a gas balance with a domestic tranche, physical tie-in provisions, sales-gas specification, metering, pipeline corridor and landing point, phasing with SAC-1, a domestic gas obligation, pricing formula, aggregator and credit support, priority rules, FLNG continuity and fiscal and disclosure terms. GLIAG's Gas-to-Shore Pre-Feasibility Study is a GLIAG proposal, not an approved project. Companion works: 10.5281/zenodo.24189783 (The Onshore Dividend). Web edition: petroleumenergyinsights.com.

Zenodo (CERN European Organization for Nuclear Research)
Affordable and clean energy, Climate action
Openalex Percentile: Top 27%
Offshore Engineering and Technologies
1.39
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
Sloanea's FLNG Choice: PFLNG DUA reuse, alternatives, project economics, the Malaysian–Surinamese legal comparison and what the FID must contain for a viable Gas-to-Shore — Marcel P.T. Chin-A-Lien · Zenodo (CERN European Organization for Nuclear Research) (2026) | TGRS Research Map | TGRS