Hybrid Project Management in Heavy Civil Construction: A Layered Framework Integrating Predictive Governance, Lean Production Control, and Adaptive Coordination

Heavy civil construction projects present a structural tension that single approach project management cannot resolve. Their governance is predictive by necessity: fixed price or unit price contracts, regulatory approvals, safety requirements, and public accountability demand baselines, critical path schedules, and earned value control. Their production, however, is variable by nature: weather, subsurface conditions, utility conflicts, material supply, and multi trade interdependence routinely invalidate weekly plans. This conceptual paper addresses the question of how predictive, lean, and adaptive practices should be allocated within the same heavy civil project, rather than whether one approach should replace the others. Drawing on the theory of production in construction, the Last Planner System, and the empirical literature on agile and hybrid project management, the paper proposes a Layered Hybrid Framework composed of three layers: a predictive governance layer, a lean production control layer, and an adaptive coordination layer. For each layer, the framework specifies purpose, core practices, cadence, and metrics, and it provides decision rules for allocating practices according to uncertainty, reversibility, and contractual constraint. Five testable propositions are derived. The paper contributes a construction specific specification of hybrid project management that respects contractual governance while treating plan reliability, measured by Percent Plan Complete and reasons for variance, as a primary control variable. A research design for empirical evaluation is proposed.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-20
DOI
https://doi.org/10.5281/zenodo.24406364
Primary Topic
Construction Project Management and Performance
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
preprint

Hybrid Project Management in Heavy Civil Construction: A Layered Framework Integrating Predictive Governance, Lean Production Control, and Adaptive Coordination

Jefferson M. Rojas Castro
2 links
Zenodo (CERN European Organization for Nuclear Research)
Construction Project Management and Performance
preprint

Hybrid Project Management in Heavy Civil Construction: A Layered Framework Integrating Predictive Governance, Lean Production Control, and Adaptive Coordination

Jefferson M. Rojas Castro
preprint en

Abstract

Heavy civil construction projects present a structural tension that single approach project management cannot resolve. Their governance is predictive by necessity: fixed price or unit price contracts, regulatory approvals, safety requirements, and public accountability demand baselines, critical path schedules, and earned value control. Their production, however, is variable by nature: weather, subsurface conditions, utility conflicts, material supply, and multi trade interdependence routinely invalidate weekly plans. This conceptual paper addresses the question of how predictive, lean, and adaptive practices should be allocated within the same heavy civil project, rather than whether one approach should replace the others. Drawing on the theory of production in construction, the Last Planner System, and the empirical literature on agile and hybrid project management, the paper proposes a Layered Hybrid Framework composed of three layers: a predictive governance layer, a lean production control layer, and an adaptive coordination layer. For each layer, the framework specifies purpose, core practices, cadence, and metrics, and it provides decision rules for allocating practices according to uncertainty, reversibility, and contractual constraint. Five testable propositions are derived. The paper contributes a construction specific specification of hybrid project management that respects contractual governance while treating plan reliability, measured by Percent Plan Complete and reasons for variance, as a primary control variable. A research design for empirical evaluation is proposed.

Zenodo (CERN European Organization for Nuclear Research)
Industry, innovation and infrastructure
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
Hybrid Project Management in Heavy Civil Construction: A Layered Framework Integrating Predictive Governance, Lean Production Control, and Adaptive Coordination — Jefferson M. Rojas Castro · Zenodo (CERN European Organization for Nuclear Research) (2026) | TGRS Research Map | TGRS