Barriers to CCUS Deployment in India's Coal Power Sector and a Proposed Energy Pathway: A Review

India’s ambition to become a developed economy by 2047 and achieve net-zero emissions by 2070 creates a structural tension between growth and decarbonization. Coal supplies 60–70% of electricity, contributes roughly half of national CO₂ emissions, and underpins regional economies, making rapid phase-out politically and economically challenging. This PRISMA-based systematic review of 185 peer-reviewed studies identifies four mutually reinforcing barriers to CCUS deployment in India’s coal power sector: high capture costs ($4.00–45.00 per tonne) and absent carbon pricing; regulatory gaps in storage liability and permitting; political resistance in coal-dependent states; and social concerns including low awareness and NIMBY attitudes. These constraints have limited progress to a single pilot project despite global expansion. Evidence from international experience supports a four-pillar pathway for India: accelerated deployment of renewable energy; strategic retrofitting of young supercritical plants; robust policy frameworks, including carbon pricing and subsidies; and just transition measures for coal regions.

Authors

Institutions

Publication Details

Journal
Research Square
Published
2026-11-20
DOI
https://doi.org/10.21203/rs.3.rs-11753727/v1
Primary Topic
Renewable energy and sustainable power systems
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
preprint

Barriers to CCUS Deployment in India's Coal Power Sector and a Proposed Energy Pathway: A Review

Rajeev Alasseri, Ajay Prabhakar, T.Joji Rao
2 links
Research Square
Renewable energy and sustainable power systems
preprint

Barriers to CCUS Deployment in India's Coal Power Sector and a Proposed Energy Pathway: A Review

Rajeev Alasseri, Ajay Prabhakar, T.Joji Rao
preprint en

Abstract

India’s ambition to become a developed economy by 2047 and achieve net-zero emissions by 2070 creates a structural tension between growth and decarbonization. Coal supplies 60–70% of electricity, contributes roughly half of national CO₂ emissions, and underpins regional economies, making rapid phase-out politically and economically challenging. This PRISMA-based systematic review of 185 peer-reviewed studies identifies four mutually reinforcing barriers to CCUS deployment in India’s coal power sector: high capture costs ($4.00–45.00 per tonne) and absent carbon pricing; regulatory gaps in storage liability and permitting; political resistance in coal-dependent states; and social concerns including low awareness and NIMBY attitudes. These constraints have limited progress to a single pilot project despite global expansion. Evidence from international experience supports a four-pillar pathway for India: accelerated deployment of renewable energy; strategic retrofitting of young supercritical plants; robust policy frameworks, including carbon pricing and subsidies; and just transition measures for coal regions.

Research Square
O. P. Jindal Global University (IN)
Industry, innovation and infrastructure, Climate action, Affordable and clean energy
Renewable energy and sustainable power systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon