From complexity data to competency decisions: an information-enabled model for complex construction projects

Purpose This study aims to develop and validate an information-enabled decision-support process innovation for diagnosing complexity–competency fit in complex construction project management. Design/methodology/approach The model translates active project-complexity information into a required project-manager competency profile through a calibrated and frozen 9 × 6 complexity–competency demand matrix. Required competency is compared with independently assessed enacted competency to generate longitudinal fit and cluster-level gap signals. Calibration involved 50 complex construction projects in Iran across four quarterly rounds, producing 200 project-round and 3,026 respondent-round observations. Validation applied the frozen matrix unchanged to 30 independent projects in Iran, Iraq, Sri Lanka and Tajikistan across six four-month waves, producing 180 project-wave observations and 150 lagged transitions. Findings The results show differentiated complexity-generated competency demand, sufficient matrix stability for unchanged holdout application and temporal wave-level variation in required competency, enacted competency and fit. Current-wave fit was positively associated with next-wave performance, while symmetric misfit was associated with a greater likelihood of subsequent performance deterioration. Dominant required–enacted gap patterns identified adaptive governance, information processing, stakeholder negotiation, coordination integration, execution discipline and technical–analytical competency as priority areas for contextual review and potential support rather than automatic intervention. Research limitations/implications The study relies partly on human ratings for complexity, demand mapping and enacted competency, although source-role separation, non-self ratings, documentary triangulation and temporal separation were used. The frozen matrix was calibrated in Iranian complex construction projects and externally validated in a more heterogeneous portfolio, so the findings support transferability-oriented explanatory relevance rather than universal invariance. Future research should test context-specific matrices and integrate digital project traces. Practical implications The model helps senior managers move beyond assignment based mainly on availability, seniority or broad experience. It provides a structured way to translate project complexity into competency demand, monitor fit during execution and identify where managerial supplementation is needed. Low fit should trigger diagnostic review and targeted support, not automatic replacement or sanctioning. Social implications The study promotes fairer and more evidence-informed project manager assignment by shifting attention from seniority, availability or reputation to the fit between project complexity and enacted capability. Its non-punitive logic supports managerial supplementation rather than blame or automatic replacement. By making competency gaps visible, the model can help organisations provide targeted support, reduce avoidable project stress and improve governance transparency in complex construction environments. Originality/value The study contributes a traceable and non-punitive process innovation that transforms fragmented project-complexity evidence into an auditable sequence of required-competency estimation, enacted-competency comparison and longitudinal fit diagnosis. It extends construction innovation beyond technology adoption by connecting project information with evidence-informed assignment review, continuing-fit monitoring and targeted managerial support in complex construction projects.

Authors

Institutions

Publication Details

Journal
Construction Innovation
Published
2026-11-23
DOI
https://doi.org/10.1108/ci-05-2026-0240
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

From complexity data to competency decisions: an information-enabled model for complex construction projects

Omid Tasa, Mahmood Golabchi
1 links
Construction Innovation
Construction Project Management and Performance
article

From complexity data to competency decisions: an information-enabled model for complex construction projects

Omid Tasa, Mahmood Golabchi
article en

Abstract

Purpose This study aims to develop and validate an information-enabled decision-support process innovation for diagnosing complexity–competency fit in complex construction project management. Design/methodology/approach The model translates active project-complexity information into a required project-manager competency profile through a calibrated and frozen 9 × 6 complexity–competency demand matrix. Required competency is compared with independently assessed enacted competency to generate longitudinal fit and cluster-level gap signals. Calibration involved 50 complex construction projects in Iran across four quarterly rounds, producing 200 project-round and 3,026 respondent-round observations. Validation applied the frozen matrix unchanged to 30 independent projects in Iran, Iraq, Sri Lanka and Tajikistan across six four-month waves, producing 180 project-wave observations and 150 lagged transitions. Findings The results show differentiated complexity-generated competency demand, sufficient matrix stability for unchanged holdout application and temporal wave-level variation in required competency, enacted competency and fit. Current-wave fit was positively associated with next-wave performance, while symmetric misfit was associated with a greater likelihood of subsequent performance deterioration. Dominant required–enacted gap patterns identified adaptive governance, information processing, stakeholder negotiation, coordination integration, execution discipline and technical–analytical competency as priority areas for contextual review and potential support rather than automatic intervention. Research limitations/implications The study relies partly on human ratings for complexity, demand mapping and enacted competency, although source-role separation, non-self ratings, documentary triangulation and temporal separation were used. The frozen matrix was calibrated in Iranian complex construction projects and externally validated in a more heterogeneous portfolio, so the findings support transferability-oriented explanatory relevance rather than universal invariance. Future research should test context-specific matrices and integrate digital project traces. Practical implications The model helps senior managers move beyond assignment based mainly on availability, seniority or broad experience. It provides a structured way to translate project complexity into competency demand, monitor fit during execution and identify where managerial supplementation is needed. Low fit should trigger diagnostic review and targeted support, not automatic replacement or sanctioning. Social implications The study promotes fairer and more evidence-informed project manager assignment by shifting attention from seniority, availability or reputation to the fit between project complexity and enacted capability. Its non-punitive logic supports managerial supplementation rather than blame or automatic replacement. By making competency gaps visible, the model can help organisations provide targeted support, reduce avoidable project stress and improve governance transparency in complex construction environments. Originality/value The study contributes a traceable and non-punitive process innovation that transforms fragmented project-complexity evidence into an auditable sequence of required-competency estimation, enacted-competency comparison and longitudinal fit diagnosis. It extends construction innovation beyond technology adoption by connecting project information with evidence-informed assignment review, continuing-fit monitoring and targeted managerial support in complex construction projects.

Construction Innovation
University of Tehran (IR), Pars University of Art and Architecture (IR)
Industry, innovation and infrastructure
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon