AN ADAPTIVE MODEL OF IT PROJECT RISK MANAGEMENT UNDER THE UNCERTAINTY OF WAR
The article addresses the management of IT project risks under the uncertainty produced by war, a setting in which the environment changes faster than the review cycle prescribed by the established process standards. The relevance of the topic follows from a tension that practitioners meet daily and that the methodological literature has not resolved. Classical risk management, as codified in the international guides and their national adaptations, rests on two assumptions: that a register of risks, once compiled, stays adequate until the next scheduled review, and that the interval between reviews can be fixed in advance. Wartime conditions undermine both. The span over which a plan may be considered reliable contracts unpredictably, and the events that invalidate a plan arrive between reviews rather than at them. The question the article discusses is therefore not whether the canonical stages of identification, assessment, response and monitoring remain valid, but what has to be added to them so that the moment of revision is decided by the state of the project rather than The article addresses the management of IT project risks under the uncertainty produced by war, a setting in which the environment changes faster than the review cycle prescribed by the established process standards. The relevance of the topic follows from a tension that practitioners meet daily and that the methodological literature has not resolved. Classical risk management, as codified in the international guides and their national adaptations, rests on two assumptions: that a register of risks, once compiled, stays adequate until the next scheduled review, and that the interval between reviews can be fixed in advance. Wartime conditions undermine both. The span over which a plan may be considered reliable contracts unpredictably, and the events that invalidate a plan arrive between reviews rather than at them. The question the article discusses is therefore not whether the canonical stages of identification, assessment, response and monitoring remain valid, but what has to be added to them so that the moment of revision is decided by the state of the project rather than
Authors
- O.V. Vasiliev (ORCID: https://orcid.org/0000-0003-1819-6761)
- Oleksandr Siroshtan (ORCID: https://orcid.org/0009-0003-5148-4770)
Institutions
- V. N. Karazin Kharkiv National University (UA)
Publication Details
- Journal
- Scientific Notes of Taurida National V I Vernadsky University Series Economy and Management
- Published
- 2026-11-20
- DOI
- https://doi.org/10.32782/2523-4803/76-4-18
- Primary Topic
- Software Engineering Techniques and Practices
- Type
- article
- Field-Weighted Citation Impact
- 0.00