AN ADAPTIVE MODEL OF IT PROJECT RISK MANAGEMENT UNDER THE UNCERTAINTY OF WAR

The article addresses the management of IT project risks under the uncertainty produced by war, a setting in which the environment changes faster than the review cycle prescribed by the established process standards. The relevance of the topic follows from a tension that practitioners meet daily and that the methodological literature has not resolved. Classical risk management, as codified in the international guides and their national adaptations, rests on two assumptions: that a register of risks, once compiled, stays adequate until the next scheduled review, and that the interval between reviews can be fixed in advance. Wartime conditions undermine both. The span over which a plan may be considered reliable contracts unpredictably, and the events that invalidate a plan arrive between reviews rather than at them. The question the article discusses is therefore not whether the canonical stages of identification, assessment, response and monitoring remain valid, but what has to be added to them so that the moment of revision is decided by the state of the project rather than The article addresses the management of IT project risks under the uncertainty produced by war, a setting in which the environment changes faster than the review cycle prescribed by the established process standards. The relevance of the topic follows from a tension that practitioners meet daily and that the methodological literature has not resolved. Classical risk management, as codified in the international guides and their national adaptations, rests on two assumptions: that a register of risks, once compiled, stays adequate until the next scheduled review, and that the interval between reviews can be fixed in advance. Wartime conditions undermine both. The span over which a plan may be considered reliable contracts unpredictably, and the events that invalidate a plan arrive between reviews rather than at them. The question the article discusses is therefore not whether the canonical stages of identification, assessment, response and monitoring remain valid, but what has to be added to them so that the moment of revision is decided by the state of the project rather than

Authors

Institutions

Publication Details

Journal
Scientific Notes of Taurida National V I Vernadsky University Series Economy and Management
Published
2026-11-20
DOI
https://doi.org/10.32782/2523-4803/76-4-18
Primary Topic
Software Engineering Techniques and Practices
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

AN ADAPTIVE MODEL OF IT PROJECT RISK MANAGEMENT UNDER THE UNCERTAINTY OF WAR

O.V. Vasiliev, Oleksandr Siroshtan
Scientific Notes of Taurida National V I Vernadsky University Series Economy and Management
Software Engineering Techniques and Practices
article

AN ADAPTIVE MODEL OF IT PROJECT RISK MANAGEMENT UNDER THE UNCERTAINTY OF WAR

O.V. Vasiliev, Oleksandr Siroshtan
article en

Abstract

The article addresses the management of IT project risks under the uncertainty produced by war, a setting in which the environment changes faster than the review cycle prescribed by the established process standards. The relevance of the topic follows from a tension that practitioners meet daily and that the methodological literature has not resolved. Classical risk management, as codified in the international guides and their national adaptations, rests on two assumptions: that a register of risks, once compiled, stays adequate until the next scheduled review, and that the interval between reviews can be fixed in advance. Wartime conditions undermine both. The span over which a plan may be considered reliable contracts unpredictably, and the events that invalidate a plan arrive between reviews rather than at them. The question the article discusses is therefore not whether the canonical stages of identification, assessment, response and monitoring remain valid, but what has to be added to them so that the moment of revision is decided by the state of the project rather than The article addresses the management of IT project risks under the uncertainty produced by war, a setting in which the environment changes faster than the review cycle prescribed by the established process standards. The relevance of the topic follows from a tension that practitioners meet daily and that the methodological literature has not resolved. Classical risk management, as codified in the international guides and their national adaptations, rests on two assumptions: that a register of risks, once compiled, stays adequate until the next scheduled review, and that the interval between reviews can be fixed in advance. Wartime conditions undermine both. The span over which a plan may be considered reliable contracts unpredictably, and the events that invalidate a plan arrive between reviews rather than at them. The question the article discusses is therefore not whether the canonical stages of identification, assessment, response and monitoring remain valid, but what has to be added to them so that the moment of revision is decided by the state of the project rather than

Scientific Notes of Taurida National V I Vernadsky University Series Economy and ManagementVol. 37(4)
V. N. Karazin Kharkiv National University (UA)
Software Engineering Techniques and Practices
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon