Remote cross-regional bid evaluation and public procurement market openness: evidence from Fujian's service procurement threshold

In January 2025, Fujian Province lowered the budget threshold for mandatory remote cross-regional bid evaluation in general services from RMB 10 million to RMB 5 million. This study examines 3,600 procurement projects in 2024 and 2025. A difference-in-discontinuities design compares the jumps at the cutoff in evaluation adoption and first-round awards to suppliers outside the buyer's city. In the main window (RMB 4.2–5.8 million), the jump in adoption increased by 66.4 percentage points (95% confidence interval, 55.6 to 77.2), and the jump in out-of-city awards increased by 20.4 points (6.2 to 34.6). Awards to suppliers outside Fujian accounted for 15.4 points of the latter increase, and awards to suppliers in other Fujian cities accounted for 5.0 points. At bandwidths of RMB 0.6 million and RMB 1 million, the estimates for out-of-city awards were 15.3 points (−1.2 to 31.8) and 16.6 points (3.6 to 29.7), respectively. The increase in out-of-city awards corresponded chiefly to a decline in local awards.

Authors

Institutions

Publication Details

Journal
Journal of fintech and business analysis.
Published
2026-11-20
DOI
https://doi.org/10.54254/3049-5768/2026.39340
Primary Topic
Public Procurement and Policy
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Remote cross-regional bid evaluation and public procurement market openness: evidence from Fujian's service procurement threshold

Fangxuan Deng, Yufan Chen
Journal of fintech and business analysis.
Public Procurement and Policy
article

Remote cross-regional bid evaluation and public procurement market openness: evidence from Fujian's service procurement threshold

Fangxuan Deng, Yufan Chen
article en

Abstract

In January 2025, Fujian Province lowered the budget threshold for mandatory remote cross-regional bid evaluation in general services from RMB 10 million to RMB 5 million. This study examines 3,600 procurement projects in 2024 and 2025. A difference-in-discontinuities design compares the jumps at the cutoff in evaluation adoption and first-round awards to suppliers outside the buyer's city. In the main window (RMB 4.2–5.8 million), the jump in adoption increased by 66.4 percentage points (95% confidence interval, 55.6 to 77.2), and the jump in out-of-city awards increased by 20.4 points (6.2 to 34.6). Awards to suppliers outside Fujian accounted for 15.4 points of the latter increase, and awards to suppliers in other Fujian cities accounted for 5.0 points. At bandwidths of RMB 0.6 million and RMB 1 million, the estimates for out-of-city awards were 15.3 points (−1.2 to 31.8) and 16.6 points (3.6 to 29.7), respectively. The increase in out-of-city awards corresponded chiefly to a decline in local awards.

Journal of fintech and business analysis.Vol. 3(4)
Zibo Normal College (CN)
Industry, innovation and infrastructure
Public Procurement and Policy
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon