构造线对照与下一步试验路线 — Paper C/D(Hilbert–Pólya 盲构造线)× Alpöge–Claude(Stepanov 重数移植线)· GH2-RH-ALP-001 观察档案
EN. Observation archive (working draft) occasioned by the Alpöge–Claude Riemann Hypothesis claim (public 2026-11-20, alpo.ge/remark.pdf + 14 Lean archive parts, unverified). Contents: (1) timeline comparison of the two construction lines — our Paper C/D Hilbert–Pólya blind-construction line with a public Zenodo timestamp chain (concept record 23969093, 55 versions since 2026-11-05) versus the claimant self-reported internal timeline (Oct 6 – Nov 16) and public release (Nov 20); (2) construction-mechanism comparison (spectral/HP route vs Stepanov-multiplicity transplantation via iterated theta lifts, chain length √X; shared explicit-formula/trace-formula interface registered under bridge-F discipline: no common-origin or influence assertions); (3) structural-form assessment per the SMTDL construction chapter v1.10.1-a1 (alpha functional compensation; four-command compound; genealogy position; novelty graded at mechanism/genealogy/institutional levels; red/yellow audit predictions); (4) registered next-step experiment routes for both lines. Meta-declaration V3. No mathematical claims; no priority claims; timestamps are provenance only. 中。应 Alpöge–Claude 黎曼猜想宣称事件(2026-11-20 公开,未获独立验证)而立的观察档案(工作草稿)。内容:双方构造线时间线对照(我方 Paper C/D 希爾伯特–波利亚盲构造线有 Zenodo 公开时间戳链:概念记录 23969093 自 2026-11-05 起 55 版;对方为自述内部时间线 10-06→11-16 + 11-20 公开);构造机制对照(谱途径 × Stepanov 重数移植之迭代 theta 提升链、链长 √X;共用显式公式/迹公式接口,按桥 F 纪律不作同源断言);按 SMTDL 构造篇 v1.10.1-a1 的结构形态判定(α 功能补偿、四命令复合、谱系位置、机制/谱系/制度三档创新度、红黄预判);双方下一步构造试验路线登记。元申报 V3。不作数学宣称、不作优先权主张;时间戳仅作谱系存证。
Authors
- Coffee (SMPDL Project)
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2026-11-21
- DOI
- https://doi.org/10.5281/zenodo.24403816
- Citations
- 5
- Primary Topic
- Analytic Number Theory Research
- Type
- article
- Field-Weighted Citation Impact
- 10.98