An Outcome-Differentiated Assessment of Highway Contract Modifications: Occurrence, Financial Magnitude, and Materiality
Highway contract-modification records capture administrative activity, positive monetary adjustments, and award-relative financial materiality, but these outcomes answer different engineering-management questions. We reconcile Kentucky Transportation Cabinet procurement and approved change-order records for 2,494 conventional highway contracts observed over the first 730 calendar days after letting. In contractor-clustered models, an award doubling is associated with higher odds of a positive-dollar order (odds ratio 1.381; 95% confidence interval 1.292–1.476). For the 835 contracts with positive additions, conditional gross positive dollars increase by a factor of 1.568 (1.445–1.702), consistent with sub proportional scaling. An award doubling shows no statistically clear association with positive signed-net changes above 5% of award (odds ratio 1.014; 0.929–1.107). Administrative orders occur on 1,726 contracts, versus positive-dollar orders on 835; gross-positive and signed-net 5% classifications differ for only five contracts. Nonlinear, program, and contractor-influence analyses qualify the pooled results. The framework supports separate reporting of ad-ministrative activity, conditional amounts, and positive net changes, not causal claims or validated cost forecasts. Monetary findings depend on source accounting definitions requiring authoritative verification.
Authors
- Malek Alazzam (ORCID: https://orcid.org/0009-0008-7621-0131)
- Khawlah Harahsheh
Publication Details
- Journal
- Preprints.org
- Published
- 2026-11-18
- DOI
- https://doi.org/10.20944/preprints202611.1862.v1
- Primary Topic
- Construction Project Management and Performance
- Type
- preprint