ARBOK-Lead-Water: Removing Lead at the Plant Outlet Instead of Digging Up Lead Service Lines

Lead service lines still carry drinking water to homes in the old districts of many cities in the United States and Europe. Chicago alone has about 387,000 of them; the city code required lead service lines until 1986 [1]. Replacing a line costs about 20,000 USD and means excavation of the street, the yard and the wall, so the full Chicago program is estimated at 8 billion USD and more, and at the current pace would take 30-40 years. This paper describes ARBOK-Lead-Water, an application of ARBOK cold vacuum evaporation (Arbok-Evaporation) installed at the outlet of city treatment plants and at district delivery points. The unit separates the water from all dissolved metals, salts and organics, which stay in a dry residue, and delivers clean, chemically neutral water into the existing network. Energy use is 0.72 kWh per cubic meter, against 4-8 kWh/m3 for reverse osmosis, and no liquid brine is produced. Water with a neutral saturation index does not dissolve lead and gradually forms a thin carbonate-phosphate film on the pipe wall. For Chicago, the estimated capital cost is 2.5-3.0 billion USD against 8 billion USD and more for replacement. ARBOK-Lead-Water is at TRL 6, and the drinking-water lead case remains to be confirmed at a reference site.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-19
DOI
https://doi.org/10.5281/zenodo.24375716
Primary Topic
Membrane Separation Technologies
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
preprint

ARBOK-Lead-Water: Removing Lead at the Plant Outlet Instead of Digging Up Lead Service Lines

D. B. Ponomarenko, Michael Vischmidt
Zenodo (CERN European Organization for Nuclear Research)
Membrane Separation Technologies
preprint

ARBOK-Lead-Water: Removing Lead at the Plant Outlet Instead of Digging Up Lead Service Lines

D. B. Ponomarenko, Michael Vischmidt
preprint en

Abstract

Lead service lines still carry drinking water to homes in the old districts of many cities in the United States and Europe. Chicago alone has about 387,000 of them; the city code required lead service lines until 1986 [1]. Replacing a line costs about 20,000 USD and means excavation of the street, the yard and the wall, so the full Chicago program is estimated at 8 billion USD and more, and at the current pace would take 30-40 years. This paper describes ARBOK-Lead-Water, an application of ARBOK cold vacuum evaporation (Arbok-Evaporation) installed at the outlet of city treatment plants and at district delivery points. The unit separates the water from all dissolved metals, salts and organics, which stay in a dry residue, and delivers clean, chemically neutral water into the existing network. Energy use is 0.72 kWh per cubic meter, against 4-8 kWh/m3 for reverse osmosis, and no liquid brine is produced. Water with a neutral saturation index does not dissolve lead and gradually forms a thin carbonate-phosphate film on the pipe wall. For Chicago, the estimated capital cost is 2.5-3.0 billion USD against 8 billion USD and more for replacement. ARBOK-Lead-Water is at TRL 6, and the drinking-water lead case remains to be confirmed at a reference site.

Zenodo (CERN European Organization for Nuclear Research)
Membrane Separation Technologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon