Optimal Production Scheduling for Multi-Product Mineral Manufacturing
Short-term scheduling in multi-product mineral manufacturing requires coordinating material movement and production across interconnected processing stages while addressing confirmed customer orders and longer-term production requirements. This work develops a generalized network-based, lexicographic multi-objective optimization (MOO) scheduling framework for these systems. The formulation represents the progression of material from raw-material supply through production and inventory to customer fulfillment. A sequential objective hierarchy first prioritizes fulfillment of confirmed customer orders and then progressively directs feasible production capacity toward cumulative targets supplied by the facility's demand-planning process. This approach ensures that the performance achieved for each higher-priority objective is preserved before subsequent targets are considered. Selected product-line activation decisions are represented using generalized disjunctive programming (GDP). An industrial mineral-manufacturing case study demonstrates the proposed framework's ability to generate feasible shift-level schedules and preserve the intended operational priorities with practical computational performance.
Authors
- Joshua L. Pulsipher (ORCID: https://orcid.org/0000-0002-7813-7870)
- Stefan Mazzadi
Publication Details
- Journal
- arXiv (Cornell University)
- Published
- 2026-11-18
- DOI
- https://doi.org/10.48550/arxiv.2611.23699
- Primary Topic
- Scheduling and Optimization Algorithms
- Type
- preprint