Optimal Production Scheduling for Multi-Product Mineral Manufacturing

Short-term scheduling in multi-product mineral manufacturing requires coordinating material movement and production across interconnected processing stages while addressing confirmed customer orders and longer-term production requirements. This work develops a generalized network-based, lexicographic multi-objective optimization (MOO) scheduling framework for these systems. The formulation represents the progression of material from raw-material supply through production and inventory to customer fulfillment. A sequential objective hierarchy first prioritizes fulfillment of confirmed customer orders and then progressively directs feasible production capacity toward cumulative targets supplied by the facility's demand-planning process. This approach ensures that the performance achieved for each higher-priority objective is preserved before subsequent targets are considered. Selected product-line activation decisions are represented using generalized disjunctive programming (GDP). An industrial mineral-manufacturing case study demonstrates the proposed framework's ability to generate feasible shift-level schedules and preserve the intended operational priorities with practical computational performance.

Authors

Publication Details

Journal
arXiv (Cornell University)
Published
2026-11-18
DOI
https://doi.org/10.48550/arxiv.2611.23699
Primary Topic
Scheduling and Optimization Algorithms
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
preprint

Optimal Production Scheduling for Multi-Product Mineral Manufacturing

Joshua L. Pulsipher, Stefan Mazzadi
arXiv (Cornell University)
Scheduling and Optimization Algorithms
preprint

Optimal Production Scheduling for Multi-Product Mineral Manufacturing

Joshua L. Pulsipher, Stefan Mazzadi
preprint en

Abstract

Short-term scheduling in multi-product mineral manufacturing requires coordinating material movement and production across interconnected processing stages while addressing confirmed customer orders and longer-term production requirements. This work develops a generalized network-based, lexicographic multi-objective optimization (MOO) scheduling framework for these systems. The formulation represents the progression of material from raw-material supply through production and inventory to customer fulfillment. A sequential objective hierarchy first prioritizes fulfillment of confirmed customer orders and then progressively directs feasible production capacity toward cumulative targets supplied by the facility's demand-planning process. This approach ensures that the performance achieved for each higher-priority objective is preserved before subsequent targets are considered. Selected product-line activation decisions are represented using generalized disjunctive programming (GDP). An industrial mineral-manufacturing case study demonstrates the proposed framework's ability to generate feasible shift-level schedules and preserve the intended operational priorities with practical computational performance.

arXiv (Cornell University)
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon