Where Should India Build Its AI Data Centres? A Question of Resources

Artificial intelligence (AI) relies on computing data-centre, storage and networking, while data-centres, in turn, depend on critical resources such as electricity, cooling water, land and high-capacity communication networks. As India’s data-centre capacity grows from about 375 MW in 2020 to around 1.5–1.6 GW in 2025–26, the siting of large AI data-centres has become both an engineering and socio-economic question. This paper examines the siting problem as a multi-resource optimisation involving water, energy, connectivity and climate resilience. Using Water Usage Effectiveness (WUE), an illustrative calculation for Chennai shows that a 300 MW data-centre cluster with a WUE of 1 L/kWh would need about 5.76 million litres of water per day, a small fraction of the recycled water available from the city’s utility. The average water availability is less important than drought-year reliability and allocation priority. Further, the electricity, especially the firm power, may be a more binding constraint than water. Treating disaster risks as core design criteria, the submarine (seabed) cable landing station can be connected to an inland siting data-centre through diverse and resilient terrestrial fibre routes. India needs a transparent, multi-criteria siting framework rather than a search for a single ideal location.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-19
DOI
https://doi.org/10.5281/zenodo.24365842
Primary Topic
Green IT and Sustainability
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Where Should India Build Its AI Data Centres? A Question of Resources

Neelakantan TR
Zenodo (CERN European Organization for Nuclear Research)
Green IT and Sustainability
article

Where Should India Build Its AI Data Centres? A Question of Resources

Neelakantan TR
article en

Abstract

Artificial intelligence (AI) relies on computing data-centre, storage and networking, while data-centres, in turn, depend on critical resources such as electricity, cooling water, land and high-capacity communication networks. As India’s data-centre capacity grows from about 375 MW in 2020 to around 1.5–1.6 GW in 2025–26, the siting of large AI data-centres has become both an engineering and socio-economic question. This paper examines the siting problem as a multi-resource optimisation involving water, energy, connectivity and climate resilience. Using Water Usage Effectiveness (WUE), an illustrative calculation for Chennai shows that a 300 MW data-centre cluster with a WUE of 1 L/kWh would need about 5.76 million litres of water per day, a small fraction of the recycled water available from the city’s utility. The average water availability is less important than drought-year reliability and allocation priority. Further, the electricity, especially the firm power, may be a more binding constraint than water. Treating disaster risks as core design criteria, the submarine (seabed) cable landing station can be connected to an inland siting data-centre through diverse and resilient terrestrial fibre routes. India needs a transparent, multi-criteria siting framework rather than a search for a single ideal location.

Zenodo (CERN European Organization for Nuclear Research)
Green IT and Sustainability
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon