From Site Selection to Deployment: Technology, Infrastructure, and Policy Requirements for Offshore Wind in Türkiye

Türkiye has large offshore wind potential and a new tender in preparation, but no operating farm. This review asks how far Turkish research can support the design of a first project. A structured search of four databases, including the national thesis center, was run on 28 October 2026. The review includes 102 studies of Turkish sites, 24 of them graduate theses. The review covers the four Turkish seas and six candidate sites. Most studies stop at screening or techno-economic feasibility; none uses offshore measurements at a candidate site. Published peak wave periods are typically 4–5 s, but return values and wind–wave misalignment are missing for most sites. Coastal peak ground acceleration near the sites is 0.18–0.56 g, and no site has a site-specific hazard analysis. The 2026 candidate areas lie mostly in water shallower than 60 m, so a first project would most likely be fixed-bottom. Floating systems matter for the deeper resource, yet only one floating concept has been sized for a Turkish site. Port and grid studies rarely go beyond distance, and no cost study tests the draft tender terms. The methods are standard; the missing pieces are measured site data and worked designs at the candidate sites.

Authors

Institutions

Publication Details

Journal
Oceans
Published
2026-11-19
DOI
https://doi.org/10.3390/oceans7060098
Primary Topic
Wind Energy Research and Development
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

From Site Selection to Deployment: Technology, Infrastructure, and Policy Requirements for Offshore Wind in Türkiye

Elif Oğuz, Mohamad Hmedi, Muhammed Uçar, Emre Uzunoglu
Oceans
Wind Energy Research and Development
article

From Site Selection to Deployment: Technology, Infrastructure, and Policy Requirements for Offshore Wind in Türkiye

Elif Oğuz, Mohamad Hmedi, Muhammed Uçar, Emre Uzunoglu
article en

Abstract

Türkiye has large offshore wind potential and a new tender in preparation, but no operating farm. This review asks how far Turkish research can support the design of a first project. A structured search of four databases, including the national thesis center, was run on 28 October 2026. The review includes 102 studies of Turkish sites, 24 of them graduate theses. The review covers the four Turkish seas and six candidate sites. Most studies stop at screening or techno-economic feasibility; none uses offshore measurements at a candidate site. Published peak wave periods are typically 4–5 s, but return values and wind–wave misalignment are missing for most sites. Coastal peak ground acceleration near the sites is 0.18–0.56 g, and no site has a site-specific hazard analysis. The 2026 candidate areas lie mostly in water shallower than 60 m, so a first project would most likely be fixed-bottom. Floating systems matter for the deeper resource, yet only one floating concept has been sized for a Turkish site. Port and grid studies rarely go beyond distance, and no cost study tests the draft tender terms. The methods are standard; the missing pieces are measured site data and worked designs at the candidate sites.

OceansVol. 7(6)
University of Lisbon (PT), Middle East Technical University (TR), Necmettin Erbakan University (TR), Instituto Superior Técnico (PT)
Wind Energy Research and Development
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon