Query-Cost-Aware Cooperative Restoration Scheduling for Interconnected Low-Voltage Distribution Areas
Interconnected low-voltage distribution areas share flexible resources for post-fault service restoration. Acquiring current support information and confirming candidate schedules compete for communication resources. This paper proposes query-cost-aware cooperative restoration scheduling to coordinate neighbor queries and the timely activation of feasible restoration instructions. Shared soft-open-point transfers couple local three-phase dispatch, photovoltaic utilization, battery operation, and load service. Cached responses guide pre-query selection using predicted dual improvement per estimated communication cost. Permanent power-balance equalities provide numerically certified curvature bounds, while current endpoint responses determine the updates. Cooperative instructions are activated after fixed-transfer optimization, nonlinear three-phase four-wire power-flow validation, battery-energy validation, and joint confirmation. Across the main paired simulations, the capped mean time to reach 90% of the reference restoration increment decreases from 20.93 to 17.05 s relative to the Full neighborhood value baseline. In branch-isolation scenarios, 240 of 240 traces attain the target within 60 s, compared with 204 for the baseline. Full query with matched curvature also attains all targets, with a mean time of 17.08 s. These results support the timing improvement of the complete design.
Authors
- Xiaoxing Lu (ORCID: https://orcid.org/0000-0003-1844-4534)
- Wenqiang Xie (ORCID: https://orcid.org/0000-0001-6568-1423)
- Fangfang Zhu
- Ziran Guo
- Xiaolong Xiao
Institutions
- State Grid Jiangsu Electric Power (China) (CN)
Publication Details
- Journal
- Energies
- Published
- 2026-11-19
- DOI
- https://doi.org/10.3390/en19225608
- Primary Topic
- Optimal Power Flow Distribution
- Type
- article
- Field-Weighted Citation Impact
- 0.00