The A.L.E.X. Methodology: A 3-Minute, Zero-Paperwork Pre-Task Safety Barrier for High-Risk Construction
A.L.E.X. is a practical, field-engineered pre-shift operational risk management methodology designed for high-risk industrial and nuclear power plant (NPP) construction projects. Synthesizing international field engineering experience (Belarus, Bangladesh, Egypt) and Human and Organizational Performance (HOP) principles, the framework embeds four critical safety barriers—Altitude (A), Life-sparks (L), Extreme Danger (E), and X-Factor (X)—directly into standard pre-task briefing forms without generating additional paperwork. The methodology relies on a 2–3 minute physical walkthrough by line supervisors, personal quality checkmarks, and unconditional Stop-Work Authority ("Stop-Card").
Authors
- Ласько Александр Игоревич
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2026-11-19
- DOI
- https://doi.org/10.5281/zenodo.24377206
- Primary Topic
- Occupational Health and Safety Research
- Type
- article
- Field-Weighted Citation Impact
- 0.00