Observation delays and decision-focused gauge acquisition: a retrospective benchmark across ten river networks
This retrospective study tests whether accounting for the delivery time of a requested river-level reading improves hypothetical precaution decisions. Across ten English river networks, eight acquisition policies were evaluated on 641 held-out high-water episodes using a 30-minute observation delay and a 60-minute action lead. For the primary direct ridge model, the mean difference in proxy loss between arrival-aware and latency-blind acquisition was +0.133 units per episode (descriptive catchment bootstrap 95% interval −0.051 to +0.339). Positive differences indicate higher loss with arrival awareness. The study established neither superiority nor equivalence. The deposit includes the article and its supplementary material. Third-party photographs and mapping material retain the licences and credits identified in the files.
Authors
- S. M. Abdulla Al Mamun
Institutions
- University of Manchester (GB)
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2026-11-19
- DOI
- https://doi.org/10.5281/zenodo.24367965
- Primary Topic
- Flood Risk Assessment and Management
- Type
- preprint