Adoption of Sustainable Public Procurement in the Public Institutions in the Public Federal Institutions in Southeast Nigeria: Influencing Factors and Challenges

Sustainable Public Procurement (SPP) is an important governance tool that is cost-effective in the long run and will anchor social and economic values and environmental attributes within public procurement. However, despite Nigerian subscribes to the Sustainable Development Goals, the implementation of SPP in the federal institutions is low with poor representation of the Southeast geopolitical zone in empirical literature. The study seeks to identify institutional factors influencing SPP implementation in selected federal public institutions of Southeast Nigeria, barriers, and capacity factors (finance, economy, regulation, and policy). The study used a cross-sectional survey design. Data were collected from 186 procurement, finance, works and tender-board officers in federal universities and polytechnics in the five Southeast states using a structured questionnaire. Data were analysed using descriptive statistics and multiple regression at 0.05 level of significance. Except for lack of appropriate capacity, policy and regulatory barriers had the greatest negative influence on SPP implementation (β = -0.442, p = 0.000) followed by financial and economic barriers (β = -0.298, p = 0.000). Institutional determinants (β = 0.376, p = 0.000) and capacity determinants (β = 0.213, p = 0.002) had positive significance. These were absence of mandatory sustainability clauses in the 2007 Public Procurement Act, poor enforcement mechanisms, financial constraints, and multiple spending priorities. The interplay of institutional and organisational resources in SPP implementation is curbed by regulatory and budgetary constraints in the study area. To overcome this set of barriers to mainstreaming SPP, there is a need to reform laws, fund, build capacity, and commit the leadership. Keywords: Sustainable public procurement, determinants, barriers, federal public institutions, Southeast Nigeria.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-19
DOI
https://doi.org/10.5281/zenodo.24363594
Primary Topic
Public Procurement and Policy
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Adoption of Sustainable Public Procurement in the Public Institutions in the Public Federal Institutions in Southeast Nigeria: Influencing Factors and Challenges

Christopher I. A. Nwoko, Ozurumba Ben, Okwara Ihuoma D.
Zenodo (CERN European Organization for Nuclear Research)
Public Procurement and Policy
article

Adoption of Sustainable Public Procurement in the Public Institutions in the Public Federal Institutions in Southeast Nigeria: Influencing Factors and Challenges

Christopher I. A. Nwoko, Ozurumba Ben, Okwara Ihuoma D.
article en

Abstract

Sustainable Public Procurement (SPP) is an important governance tool that is cost-effective in the long run and will anchor social and economic values and environmental attributes within public procurement. However, despite Nigerian subscribes to the Sustainable Development Goals, the implementation of SPP in the federal institutions is low with poor representation of the Southeast geopolitical zone in empirical literature. The study seeks to identify institutional factors influencing SPP implementation in selected federal public institutions of Southeast Nigeria, barriers, and capacity factors (finance, economy, regulation, and policy). The study used a cross-sectional survey design. Data were collected from 186 procurement, finance, works and tender-board officers in federal universities and polytechnics in the five Southeast states using a structured questionnaire. Data were analysed using descriptive statistics and multiple regression at 0.05 level of significance. Except for lack of appropriate capacity, policy and regulatory barriers had the greatest negative influence on SPP implementation (β = -0.442, p = 0.000) followed by financial and economic barriers (β = -0.298, p = 0.000). Institutional determinants (β = 0.376, p = 0.000) and capacity determinants (β = 0.213, p = 0.002) had positive significance. These were absence of mandatory sustainability clauses in the 2007 Public Procurement Act, poor enforcement mechanisms, financial constraints, and multiple spending priorities. The interplay of institutional and organisational resources in SPP implementation is curbed by regulatory and budgetary constraints in the study area. To overcome this set of barriers to mainstreaming SPP, there is a need to reform laws, fund, build capacity, and commit the leadership. Keywords: Sustainable public procurement, determinants, barriers, federal public institutions, Southeast Nigeria.

Zenodo (CERN European Organization for Nuclear Research)
Public Procurement and Policy
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon