Optimal Placement of Thyristor Controlled Series Compensator (TCSC) for Congestion Management in Nigeria 330kV Network

Transmission congestion is one of the major operational challenges affecting the secure and efficient utilization of high-voltage power networks. In the Nigerian 330 kV transmission system, increasing demand, geographically dispersed generation and load centres, long transmission corridors, network impedance and limited transfer capability can result in heavily loaded transmission lines, increased losses and reduced system security. This study investigates the optimal placement of Thyristor Controlled Series Compensator (TCSC) for congestion management in the Nigerian 330 kV transmission network. The study proposes a sensitivity-based optimization framework in which Newton–Raphson load flow is initially used to establish the base-case operating condition, while line-loading severity, power-transfer distribution factor, voltage deviation and Available Transfer Capability (ATC) are employed to identify critical transmission corridors. A TCSC is subsequently represented as a controllable series reactance whose compensation level is optimized subject to transmission-line thermal, bus-voltage, generator and TCSC operating constraints. Normal, 110% loading and N−1 contingency conditions are considered to evaluate the effectiveness of the proposed approach. The principal objective is to minimize a composite congestion index while maximizing ATC and maintaining acceptable voltage profiles. Published Nigerian benchmark results demonstrate the relevance of this approach: a 2024 study using a 28-bus Southern Nigerian 330 kV network identified the Benin–Oshogbo transmission corridor as an optimal TCSC location and reported ATC improvements to approximately 85–92 MW across the investigated buses. More recent Nigerian studies have also reported reductions in voltage violations and active power losses following optimal TCSC placement. The proposed framework extends these studies by treating congestion relief and security enhancement as primary objectives and by incorporating N−1 contingency assessment. The study is expected to provide a practical methodology for improving the utilization of existing Nigerian 330 kV transmission infrastructure without relying exclusively on immediate construction of new transmission corridors.

Authors

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-19
DOI
https://doi.org/10.5281/zenodo.24358978
Primary Topic
Power System Optimization and Stability
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Optimal Placement of Thyristor Controlled Series Compensator (TCSC) for Congestion Management in Nigeria 330kV Network

G.A James, D.I Bayan, J.I Sozaowei, J.D Peletiri et al.
Zenodo (CERN European Organization for Nuclear Research)
Power System Optimization and Stability
article

Optimal Placement of Thyristor Controlled Series Compensator (TCSC) for Congestion Management in Nigeria 330kV Network

G.A James, D.I Bayan, J.I Sozaowei, J.D Peletiri, C.O Uloh
article en

Abstract

Transmission congestion is one of the major operational challenges affecting the secure and efficient utilization of high-voltage power networks. In the Nigerian 330 kV transmission system, increasing demand, geographically dispersed generation and load centres, long transmission corridors, network impedance and limited transfer capability can result in heavily loaded transmission lines, increased losses and reduced system security. This study investigates the optimal placement of Thyristor Controlled Series Compensator (TCSC) for congestion management in the Nigerian 330 kV transmission network. The study proposes a sensitivity-based optimization framework in which Newton–Raphson load flow is initially used to establish the base-case operating condition, while line-loading severity, power-transfer distribution factor, voltage deviation and Available Transfer Capability (ATC) are employed to identify critical transmission corridors. A TCSC is subsequently represented as a controllable series reactance whose compensation level is optimized subject to transmission-line thermal, bus-voltage, generator and TCSC operating constraints. Normal, 110% loading and N−1 contingency conditions are considered to evaluate the effectiveness of the proposed approach. The principal objective is to minimize a composite congestion index while maximizing ATC and maintaining acceptable voltage profiles. Published Nigerian benchmark results demonstrate the relevance of this approach: a 2024 study using a 28-bus Southern Nigerian 330 kV network identified the Benin–Oshogbo transmission corridor as an optimal TCSC location and reported ATC improvements to approximately 85–92 MW across the investigated buses. More recent Nigerian studies have also reported reductions in voltage violations and active power losses following optimal TCSC placement. The proposed framework extends these studies by treating congestion relief and security enhancement as primary objectives and by incorporating N−1 contingency assessment. The study is expected to provide a practical methodology for improving the utilization of existing Nigerian 330 kV transmission infrastructure without relying exclusively on immediate construction of new transmission corridors.

Zenodo (CERN European Organization for Nuclear Research)
Nigeria Maritime University (NG)
Power System Optimization and Stability
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon