Integrated Cost-Schedule-Procurement Risk Index: A Framework and Validation Protocol for Hyper-Scale Data-Center Construction

Hyperscale data-center projects combine high capital cost, compressed schedules, specialized long-lead equipment, and global supply chains. Conventional project controls review cost, schedule, procurement, and operational measures separately, so deterioration that starts upstream, for example in procurement, may appear in the Cost Performance Index (CPI) and Schedule Performance Index (SPI) only after it has become costly to recover. This paper proposes the Integrated Cost-Schedule-Procurement Risk Index (ICSP-RI), a composite early-warning index for hyperscale data-center construction, together with a protocol for developing and validating it. The framework starts from 42 candidate indicators in four categories (cost, schedule, procurement, and operational), which are screened, normalized to a common 0–1 risk scale, weighted, and aggregated into a project-level score. The paper specifies the normalization and aggregation formulas, the procedure for estimating weights, provisional risk classes, and a validation design that compares the index with CPI and SPI alone and with a baseline model that combines CPI, SPI, and the procurement variables. Because real project records could not be used, the protocol is demonstrated on synthetic data from a simulation of 40 projects over 24 monthly periods in three scenarios. The demonstration shows that the pipeline runs end to end and behaves sensibly: the index is more accurate than earned-value indicators alone when procurement or operational signals carry information, and shows no gain when they do not. However, the composite performs about as well as using all retained indicators without aggregation, and in the scenario where procurement and execution stress both drive outcomes, it did not meet the pre-specified criterion of improving on a baseline that combines earned-value and procurement indicators. No results from real projects are reported, and the simulation results follow from its stated assumptions.

Authors

Publication Details

Journal
International Journal of Sustainability and Innovation in Engineering
Published
2026-11-18
DOI
https://doi.org/10.56830/ijsie202619
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Integrated Cost-Schedule-Procurement Risk Index: A Framework and Validation Protocol for Hyper-Scale Data-Center Construction

Ravi Charan Kattula
International Journal of Sustainability and Innovation in Engineering
Construction Project Management and Performance
article

Integrated Cost-Schedule-Procurement Risk Index: A Framework and Validation Protocol for Hyper-Scale Data-Center Construction

Ravi Charan Kattula
article en

Abstract

Hyperscale data-center projects combine high capital cost, compressed schedules, specialized long-lead equipment, and global supply chains. Conventional project controls review cost, schedule, procurement, and operational measures separately, so deterioration that starts upstream, for example in procurement, may appear in the Cost Performance Index (CPI) and Schedule Performance Index (SPI) only after it has become costly to recover. This paper proposes the Integrated Cost-Schedule-Procurement Risk Index (ICSP-RI), a composite early-warning index for hyperscale data-center construction, together with a protocol for developing and validating it. The framework starts from 42 candidate indicators in four categories (cost, schedule, procurement, and operational), which are screened, normalized to a common 0–1 risk scale, weighted, and aggregated into a project-level score. The paper specifies the normalization and aggregation formulas, the procedure for estimating weights, provisional risk classes, and a validation design that compares the index with CPI and SPI alone and with a baseline model that combines CPI, SPI, and the procurement variables. Because real project records could not be used, the protocol is demonstrated on synthetic data from a simulation of 40 projects over 24 monthly periods in three scenarios. The demonstration shows that the pipeline runs end to end and behaves sensibly: the index is more accurate than earned-value indicators alone when procurement or operational signals carry information, and shows no gain when they do not. However, the composite performs about as well as using all retained indicators without aggregation, and in the scenario where procurement and execution stress both drive outcomes, it did not meet the pre-specified criterion of improving on a baseline that combines earned-value and procurement indicators. No results from real projects are reported, and the simulation results follow from its stated assumptions.

International Journal of Sustainability and Innovation in EngineeringVol. 4(1)
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon