AGILE PROJECT MANAGEMENT TECHNIQUES AND PERFORMANCE OF ROAD CONSTRUCTION PROJECTS IN NAIROBI CITY COUNTY, KENYA
Purpose of the study: The study examined the influence of iterative planning and review cycles, collaborative sprint planning, enhanced customer involvement and financial management on the performance of road construction projects in Nairobi City County, Kenya. Statement of the problem: Road construction projects face persistent challenges involving delays, cost overruns and stakeholder dissatisfaction. Existing evidence provides limited understanding of the distinct contributions of agile management techniques when examined together within major urban road projects. Research methodology: A quantitative descriptive cross-sectional design was adopted. The target population comprised 171 stakeholders associated with the Nairobi Eastern and Western Bypass projects. A sample of 120 respondents was selected through stakeholder stratification and snowball recruitment. All questionnaires were returned, and 115 complete cases were available for multiple regression. Structured questionnaire data were analysed using descriptive statistics, Pearson correlation and multiple linear regression in SPSS version 28. Findings: The four techniques jointly explained 71.3% of the variation in perceived project performance (R² = .713; adjusted R² = .703; F(4, 110) = 68.450, p < .001). Collaborative sprint planning (B = .212, β = .221, p = .009), enhanced customer involvement (B = .344, β = .365, p < .001) and financial management (B = .223, β = .262, p = .001) had positive, statistically significant adjusted associations with performance. Iterative planning and review cycles had a positive but statistically insignificant adjusted association (B = .136, β = .117, p = .210). Conclusion: Collaborative planning, customer involvement and financial management were significant correlates of performance within the combined model. Customer involvement had the largest standardised coefficient, while iterative planning did not explain a statistically significant additional contribution after adjustment for the other techniques. Recommendations: Project teams should strengthen joint work planning, institutionalise community feedback and improve accessible financial reporting. Review meetings should produce assigned corrective actions and inform subsequent work plans. These recommendations should be applied with attention to the study's two-project scope and reliance on stakeholder perceptions. Keywords: Agile project management, iterative planning, collaborative sprint planning, customer involvement, financial management, road construction, Nairobi City County.
Authors
- Maurice Pedo (PhD)
- Chagusia Dennis Mavundi
Publication Details
- Journal
- African Journal of Emerging Issues
- Published
- 2026-11-17
- Primary Topic
- Construction Project Management and Performance
- Type
- article
- Field-Weighted Citation Impact
- 0.00