Analysis of Labor and Equipment Productivity in Ground Floor Slab Construction Using Work Sampling

The effectiveness and advancement of construction projects are significantly influenced by labor and equipment productivity. However, poor monitoring of productivity levels often leads to delays and schedule violations. This study uses a work sampling approach in an Indonesian market development project to assess labor and heavy equipment productivity in ground floor slab construction. The study used project documentation such as timetables, quantity plans, and equipment records to support the research, which was carried out through direct field observations that documented worker behaviors at random intervals. Key construction tasks like earth fill, sand fill, reinforcement, and concrete casting are the focus of the investigation. With earth fill reaching 35.54 m³/day, sand fill 14.06 m³/day, reinforcement 864.69 kg/day, and concrete casting 8.11 m³/day, the data demonstrate that worker productivity varies between operations. Meanwhile, equipment productivity was 0.135 m³/minute for mixer trucks and 0.4957 m³/minute for excavators. The work sample results reveal inefficiencies brought on by unprepared site conditions and overlapping task sequences by showing discrepancies between planned and observed output. The production level is deemed sufficient overall, but to minimize deviations, better planning and site preparation are required. This study shows that work sampling is a useful and trustworthy method for tracking construction productivity and spotting performance gaps under actual project circumstances.

Authors

Publication Details

Journal
Journal of Infrastructure and Civil Engineering
Published
2026-11-17
DOI
https://doi.org/10.35583/jice.v6i3.252
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Analysis of Labor and Equipment Productivity in Ground Floor Slab Construction Using Work Sampling

Daniel Anderson Munthe, Hindra Karamah Putra Handana, Wisnu Prayogo, Naufal Tinov et al.
Journal of Infrastructure and Civil Engineering
Construction Project Management and Performance
article

Analysis of Labor and Equipment Productivity in Ground Floor Slab Construction Using Work Sampling

Daniel Anderson Munthe, Hindra Karamah Putra Handana, Wisnu Prayogo, Naufal Tinov, Sarra Rahmadani, Mujaroh Khotimah, Vina Lestari Riyandini, Arrisha Anggraini, Doanta Aprijan Silalahi, Edo Barlian, Melvi Maulita Napitupulu, I Wayan Putra Jayantara, Cut Meuthia Rani, Novrizaldi Wardana
article en

Abstract

The effectiveness and advancement of construction projects are significantly influenced by labor and equipment productivity. However, poor monitoring of productivity levels often leads to delays and schedule violations. This study uses a work sampling approach in an Indonesian market development project to assess labor and heavy equipment productivity in ground floor slab construction. The study used project documentation such as timetables, quantity plans, and equipment records to support the research, which was carried out through direct field observations that documented worker behaviors at random intervals. Key construction tasks like earth fill, sand fill, reinforcement, and concrete casting are the focus of the investigation. With earth fill reaching 35.54 m³/day, sand fill 14.06 m³/day, reinforcement 864.69 kg/day, and concrete casting 8.11 m³/day, the data demonstrate that worker productivity varies between operations. Meanwhile, equipment productivity was 0.135 m³/minute for mixer trucks and 0.4957 m³/minute for excavators. The work sample results reveal inefficiencies brought on by unprepared site conditions and overlapping task sequences by showing discrepancies between planned and observed output. The production level is deemed sufficient overall, but to minimize deviations, better planning and site preparation are required. This study shows that work sampling is a useful and trustworthy method for tracking construction productivity and spotting performance gaps under actual project circumstances.

Journal of Infrastructure and Civil Engineering
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon