Dynamic timing points for disturbance-responsive automatic train operation

Disturbances that cause deviations from the planned timetable are prevalent in mainline railway operations. If unmanaged, they can lead to unnecessary braking, increased energy consumption, and loss of punctuality. This paper develops and evaluates a dynamic Timing Point (TP) generation method that enhances the adaptability of Train Path Envelopes (TPEs), which define operational constraints for the train trajectory generation in Automatic Train Operation (ATO). The paper focuses on observed departure delays due to dwell time extensions. Based on this delay, the approach predicts blocking time overlaps with following trains and, if any, generates dynamic TPs for anticipatory control, thereby avoiding unnecessary braking and re-acceleration. The method is tested on the Dutch Utrecht–’s-Hertogenbosch corridor with tightly scheduled heterogeneous train services. Across dwell time extensions between 1 and 5 min of the preceding train, dynamic TPs consistently improve energy efficiency and punctuality compared with a reactive benchmark where the following train responds only to a restricted movement authority. When blocking time overlaps can be resolved within the available running time supplement of the following train, energy reductions relative to the reactive benchmark can reach approximately 40% in the evaluated scenarios, whereas for larger overlaps, dynamic TPs help prevent unnecessary braking and minimise arrival delay. Additional analyses of intermediate TPE updates and TPE update time highlight the importance of timely communication and computation to balance disturbance responsiveness with smooth train trajectory adaptation. In addition, this paper assumes dynamic TP generation at the ATO trackside and discusses allocation to the Traffic Management System as an alternative, considering responsiveness and consistency with the real-time traffic plan.

Authors

Institutions

Publication Details

Journal
Journal of Rail Transport Planning & Management
Published
2026-11-18
DOI
https://doi.org/10.1016/j.jrtpm.2026.100614
Primary Topic
Railway Systems and Energy Efficiency
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Dynamic timing points for disturbance-responsive automatic train operation

Ziyulong Wang, Andreas Hegyi, Rob M.P. Goverde, Rosanne Wijgman
4 links
Journal of Rail Transport Planning & Management
Railway Systems and Energy Efficiency
article

Dynamic timing points for disturbance-responsive automatic train operation

Ziyulong Wang, Andreas Hegyi, Rob M.P. Goverde, Rosanne Wijgman
article en

Abstract

Disturbances that cause deviations from the planned timetable are prevalent in mainline railway operations. If unmanaged, they can lead to unnecessary braking, increased energy consumption, and loss of punctuality. This paper develops and evaluates a dynamic Timing Point (TP) generation method that enhances the adaptability of Train Path Envelopes (TPEs), which define operational constraints for the train trajectory generation in Automatic Train Operation (ATO). The paper focuses on observed departure delays due to dwell time extensions. Based on this delay, the approach predicts blocking time overlaps with following trains and, if any, generates dynamic TPs for anticipatory control, thereby avoiding unnecessary braking and re-acceleration. The method is tested on the Dutch Utrecht–’s-Hertogenbosch corridor with tightly scheduled heterogeneous train services. Across dwell time extensions between 1 and 5 min of the preceding train, dynamic TPs consistently improve energy efficiency and punctuality compared with a reactive benchmark where the following train responds only to a restricted movement authority. When blocking time overlaps can be resolved within the available running time supplement of the following train, energy reductions relative to the reactive benchmark can reach approximately 40% in the evaluated scenarios, whereas for larger overlaps, dynamic TPs help prevent unnecessary braking and minimise arrival delay. Additional analyses of intermediate TPE updates and TPE update time highlight the importance of timely communication and computation to balance disturbance responsiveness with smooth train trajectory adaptation. In addition, this paper assumes dynamic TP generation at the ATO trackside and discusses allocation to the Traffic Management System as an alternative, considering responsiveness and consistency with the real-time traffic plan.

Journal of Rail Transport Planning & ManagementVol. 41
Delft University of Technology (NL)
European Commission, ProRail, HORIZON EUROPE Framework Programme
Industry, innovation and infrastructure
Railway Systems and Energy Efficiency
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon